Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ALLOWANCE FOR INCIDENTAL ASBESTOS ABATEMENT

E. Throughout the specifications, reference is made to codes and standards which establish qualities and types of workmanship and materials, and which establish methods for testing and reporting on the pertinent characteristics thereof.

13 WORK ORDER LETTERS

A. Work Order Letters will be issued throughout the Contact period, and as required to cover the services requested.

1.4 ESTIMATED QUANTITY

The Department of Design and Construction reserves the right during the term of this Contract to determine the number of Work Order Letters and the Scope of Work to be included therein, and shall not be deemed to be limited by the estimate amount of the allowance nor does this Contract guarantee or obligate the Department of Design and Construction to issue a required number of Work Order Letters. The Contractor is cautioned that payment will not be made for any work that is not authorized by the Department of Design and Constimction.

When work is ordered, the Contractor will visit the subject location within one (1) working day of notification to ascertain actual work required. If the Work Order Letter identified the project as being "urgent", then work shall commence not later than 48 hours from the time of notification. In this event, the contractor shall immediately notify EPA NESHAPS Coordinator and NYCDEP of start of the work and file the necessary Asbestos Variance Application (ACP-9) with the NYCDEP.

In the event that the Work Order Letter does not identify the project as "urgent" the Contractor shall notify the EPA NESHAPS Coordinator and NYCDEP by letter, postmarked 10 days before activity begins if 260 linear feet or more and/or 160 square feet or more of asbestos containing material will be disturbed.

The following information must be included in the notification:

A. Name and address of building City or operator;

B. Project description:

1. Size - square feet, number of linear feet, etc;

2. Age - date of construction and renovations (if known);

3. Use - i.e., office, school, industrial, etc.

4. Scope - repair, demolition, cleaning, etc.

C. Amount of asbestos involved in work and an explanation of techniques used to determine the amount;

CAPITAL PROJECT NUMBER XXXXX 01020-95 100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631344

NYC-WTC_000416856

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416856Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →