Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

(4) Repeat procedure for second layer. All joints in polyethylene sheeting shall be glued and taped in such a manner as to prohibit air passage. Joints on plastic layers shall be staggered to reduce the potential for water to penetrate.

(5) In areas where demolition is required to access ACM, a layer of 6-mil reinforced polyethylene sheeting shall be placed on the floor of the enclosure.

(6) Perform demolition required to access ACM. Debris resulting from demolition activities shall be disposed of as ACM as described in this Specification.

(7) Repeat preparation of areas accessed by demolition activities as described above.

(8) Suspended ceiling tiles and T-grid components shall remain in place until the preparation of the Work Area below the ceiling tiles are completed and personnel and equipment decontamination enclosures have been constructed.

(9) Protect non-ACM insulation within the Work Area(s) with two individual layers of 6-mil polyethylene sheeting. Sheeting shall remain in-place until satisfactory clearance air monitoring results are achieved.

m) Installation of glove-bags for removal of thermal system insulation, when required:

(1) General: Glove-bag operations shall be performed using commercially available glove-bags of at least 6-mil, transparent plastic appropriately sized for the diameter of the material to be removed. The use of "moveable" glove­ bag techniques is strictly forbidden. At no time, shall the glove-bag be sized to allow for the removal of more that three linear feet of insulation.

(2) Place the necessary tools and materials inside of the tool pouch of the glove-bag before.

(3) Place duct-tape securely around the affected area to form a smooth area to which the glove-bag can be securely fastened.

(4) Attach glove-bag to the cable, wire or pipe. Seal top of CAPITAL PROJECT NUMBER PO79201K 02081-67 100: CONTRACT DOCUMENTS REV. May 3,2000 - 67 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631316

NYC-WTC_000416828

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416828Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →