NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

glove-bag by double folding and stapling. Place duct-tape along the seam to form an airtight seal. Seal sides of glove­ bag, where cable, wire or pipe passes through, with duct­ tape to form an airtight seal.

(5) If the material adjacent to the work section is damaged, terminates, is jointed or contains an irregularity, wrap the section in two layers of 6-mil fire retardant polyethylene sheeting and seal airtight with duct-tape.

(6) Smoke test the glove-bag as indicated below. The Testing Laboratory shall present during all smoke testing.

(7) Aspirate the contents of a smoke tube through the water port access of the bag.

(a) Seal the water access port airtight with duct-tape.

(b) Gentle squeeze the glove-bag and visually check for any leaks.

(c) Seal any points of leakage airtight with duct-tape.

n) Workers shall follow all procedures for the glove-bag removal methodology.

o) Pre-Removal Inspections

(1) Prior to removal of any ACM, the Contractor shall notify the Testing Laboratory and request a pre-removal inspection. Posting of warning signs, building of decontamination enclosure systems, and all other preparatory steps have been taken prior to notification of the Testing Laboratory.

(2) Contractor shall correct any deficiencies observed by Testing Laboratory at no additional cost to City.

(3) Following the Testing Laboratory's approval of the Work Area preparations, removal of ACM may commence.

2. Removal of ACM Thermal Insulation Using Glove-Bag Techniques:

a) Mist material with amended water. Allow sufficient time for the amended water to penetrate the material to be removed.

b) Remove the insulation using hand tools such as knives or scissors. CAPITAL PROJECT NUMBER PO79201K 02081-68 100: CONTRACT DOCUMENTS REV. May 3,2000 - 68 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631317

NYC-WTC_000416829

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416829Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →