Asbestos Abatement
glove-bag by double folding and stapling. Place duct-tape
along the seam to form an airtight seal. Seal sides of glove
bag, where cable, wire or pipe passes through, with duct
tape to form an airtight seal.
(5) If the material adjacent to the work section is damaged,
terminates, is jointed or contains an irregularity, wrap the
section in two layers of 6-mil fire retardant polyethylene
sheeting and seal airtight with duct-tape.
(6) Smoke test the glove-bag as indicated below. The Testing
Laboratory shall present during all smoke testing.
(7) Aspirate the contents of a smoke tube through the water
port access of the bag.
(a) Seal the water access port airtight with duct-tape.
(b) Gentle squeeze the glove-bag and visually check for
any leaks.
(c) Seal any points of leakage airtight with duct-tape.
n) Workers shall follow all procedures for the glove-bag removal
methodology.
o) Pre-Removal Inspections
(1) Prior to removal of any ACM, the Contractor shall notify
the Testing Laboratory and request a pre-removal
inspection. Posting of warning signs, building of
decontamination enclosure systems, and all other
preparatory steps have been taken prior to notification of
the Testing Laboratory.
(2) Contractor shall correct any deficiencies observed by
Testing Laboratory at no additional cost to City.
(3) Following the Testing Laboratory's approval of the Work
Area preparations, removal of ACM may commence.
2. Removal of ACM Thermal Insulation Using Glove-Bag Techniques:
a) Mist material with amended water. Allow sufficient time for the
amended water to penetrate the material to be removed.
b) Remove the insulation using hand tools such as knives or scissors.
CAPITAL PROJECT NUMBER PO79201K 02081-68
100: CONTRACT DOCUMENTS REV. May 3,2000
- 68 -100% CONTRACT DOCUMENTS