NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§1-105 TITLE IS—DEPT. OF ENVIRONMENTAL PROTECTION

(c) Utilities’ service components shall be lowered or removed as necessary and reinstalled in a manner which permits proper utilization and does not disturb the integrity of the enclosures.

(d) Enclosed asbestos-containing materials shall be identified (e.g., using a sign, label, or color coding) in order to warn building maintenance personnel in the event that the enclosure must be disturbed.-

(e) The following maintenance procedures are recommended:

(1) A periodic inspection and maintenance program, consisting of an inspection at least annually to check for damage to all enclosed surfaces . Re-enclosure and repairs are to be performed according to NYC Work Site Procedure regulations.

(2) Maintenance of records by the building owner, on the locations and condition of the enclosed material and on alteration, renovation, modifica­ tion, or other procedures resulting in disturbance of the enclosed material.

(3) When conditions change and enclosure is no longer an appropriate method of asbestos abatement, additional abatement methods should be conducted.

§1-105 Glovebag Procedures. The following procedures shall be fol­ lowed during the conduct of abatement activities;

(a) Glovebag procedure:; shall be done using commercially available glove­ bags of 6-mil clear plastic, appropriately sized for the project. Glovebags may not be shifted down and shall not be moved from the initial surface to another surface, or reinstalled on the initial surface once removed.

(b) The glovebag procedure shall be performed in accordance with the following:

(1) All necessary tools and materials shall be brought into the work area before the glovebag procedure begins.

(2) Air monitoring shall be conducted in accordance with § § 1-31 through 1-45.

(3) Glovebag procedures shall be conducted by workers specifically trained in glovebag procedures and equipped with appropriate personal protective equipment.

(4) The insulation diameter worked shall not exceed one half the bag working length above the attached gloves.

5864 RCNY 5-31-98

CrTY_2IMCl0 0_0 062 42995

NYC-WTC_OOO411864

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411864Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →