NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 75 pages

RCNY Chapter 1 asbestos regulations, 1998

Machine-extracted title · confidence 38%

COSH-related NYC RO regulatory chapter on asbestos control.

NYC-WTC_000411802–000411876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CHAPTER 1—ASBESTOS CONTROL PROGRAM §1-104

(g) Application of bridging encapsulants over ACM shall provide the manufacturer’s specified number of inches or minimum diy film thickness. (h) A different color for each coat of encapsulant (per manufacturer’s specifications) shall be used. (i) Penetrating encapsulants Shall be applied to penetrate existing asbes­ tos-containing materials to the substrate. During treatment with a penetrat­ ing encapsulant, selected random core samples of the asbestos-containing materials shall be removed to check the depth of penetration. The resulting space shall be treated as outlined (in subdivision (a)) above and re-encapsu­ lated. (j) Encapsulants shall be applied using airless spray equipment. (1) Spraying shall occur at the lowest pressure range possible-to mini-— mize fiber release from encapsulant impact at the surface. It shall be applied with a consistent horizontal or vertical motion. (2) Each subsequent coat of encapsulant shall be applied at a right angle to the preceding coat application or per manufacturer’s specifications. (k) Encapsulated asbestos-containing materials shall be identified (e.g. using labels, signs or color coding) in order to warn building maintenance personnel in the event encapsulated materials must be disturbed. (1) The following maintenance procedures are recommended: (1) A periodic inspection and maintenance program, consisting of an inspection at least annually to check for damage to all encapsulated surfaces. Recoating and repairs are to be performed according to procedures in this section. (2) Maintenance of records by the building owner, on the locations and condition of the encapsulated material and on alteration, renovation, modi­ fication, or other procedures that resulted in disturbance of the encapsu­ lated material. (3) When conditions change and encapsulation is no longer an appropri­ ate method, additional abatement methods should be conducted.

§1-104 Enclosure Procedures. The following procedures shall be fol­ lowed for the enclosure of ACM: (a) Loose and hanging asbestos-containing materials that may be dis­ turbed during the installation of hangers or other support/framing materials for the enclosure shall be removed by wet methods in accordance with §1-102: “Disturbance, Handling, and Removal”. (b) After installation of hangers, brackets or other enclosure supports and before installation of enclosure materials, damaged areas of fireproofing/ther- mal insulation shall be repaired using a replacement material.

5863 RCNY 5-31-98

CITY_21MC100_006242994

NYC-WTC_000411863

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000411863Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Compare copies and versions →