NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

Asbestos inspection plan, NY Department of Labor

Machine-extracted title · confidence 41%

Asbestos Part 56 inspection reference document, NYC.

NYC-WTC_000451646–000451756
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(1) Penetration Requirements. Penetrating encapsulants shall be applied and penetrate existing asbestos material to the substrate.

(2) Testing of Penetration. During treatment with a penetrating encapsulant, selected random core samples of asbestos material shall be removed and checked to verify full depth of penetration.

(3) Coior Requirement. Each coat of penetrating encapsulant shall be color coded as per manufacturer's recommendations, if any, except for the prohibition of pigment use.

(h) Methods of Application. Encapsulants shall be applied using airless spray equipment as follows:

(1) Spraying Pressure. Spraying shall be performed at the lowest pressure range possible to minimize asbestos fiber release.

(2) Spray Tip. The optimum spray tip shall be chosen on the basis of the viscosity and percent solids of the encapsulant. The cone projection of the tip shall be as specified by the manufacturer.

(3) Subsequent Coats. Each subsequent coat of encapsulant shall be applied at a 90-degree angle to the preceding coat application or per manufacturer’s specifications.

(4) Encapsulant Solvent or Vehicle. The encapsulant solvent or vehicle shall not be or contain a volatile material. It shall not release hazardous air pollutants, as defined by NYS DEC 6 NYCRR 200.1 (ag), into the air when applied or during curing.

(i) Encapsulant Fire-Resistance Properties. If the asbestos material has been used for fire retardation or protection of structural members or both, the encapsulant material used shall have a flame spread rating, fireproofing and smoke characteristics similar to the material being repaired or encapsulated.

(j) Marking or Labeiing. Encapsulated ACM, PACM, or asbestos material shall be conspicuously marked or labeled in order to warn persons of its presence.

(k) Cleanup. Waste cleanup shall be in accordance with Section 56-8.5.

(I) Final Cleaning and Clearance Air Sampling. Final cleaning and clearance air sampling shall be in accordance with Subpart 56-9.

56-8.8 Asbestos Materiai Encasement/Enciosure Procedures. The encasement/enclosure of existing ACM, PACM or asbestos material shall be conducted in accordance with the following:

12 NYCRR56 Subparts, Page 82

CITY_21MC100_003243885

NYC-WTC_000451728

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451728Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →