NYC 9/11 Public Portal Document
Asbestos Abatement
areas with public access, or in correctional facilities, frame
work shall be lined with minimum 3/8" thickness plywood
sheathing. Sheathing shall be caulked or taped airtight at all
joints and seams.
(3) Interior shall be covered with two layers of opaque 6-
mil polyethylene sheeting, with a minimum overlap of
16 inches at seams. Seal seams airtight using tape and
adhesive. The interior floor shall be covered with two
(2) layers of reinforced fire-retardant polyethylene
sheeting with a minimum overlap on the walls of sixteen
inches.
(4) Entrances to the decontamination unit shall be secured
with lockable hinged doors. Doors shall be open at all
times when abatement operations are in progress. Doors
shall be louvered to allow for air movement through the
decontamination units into Work Area.
b) Curtained Doorways: A device to allow ingress or egress from one
room to another while permitting minimal air movement between
the rooms.
c) Air Locks: Air locks shall consist of two curtained doorways
placed a minimum of three feet apart.
d) Decontamination Enclosure System shall be placed adjacent to the
Work Area and shall consist of three totally enclosed chambers,
separated from Work Area and each other by airlocks, as follows:
(1) Shower Room: The shower room shall have two airlocks
(one that separates it from the work area and one that
separates it from the clean room). The shower room shall
contain at least one shower, with hot and cold water
adjustable at the tap, per eight workers. Careful attention
shall be given to the shower to ensure against leaking of
any kind. Contractor shall supply towels, shampoo and
soap in the shower room at all times. Shower water shall be
drained collected, and filtered through a system with at
least a 5-micron particle size collection capacity. A system
containing a series of several filters with progressively
smaller pore sizes shall be used to avoid rapid clogging of
the filters by large particles. Filtered water shall be
discharged in accordance with applicable codes.
Contaminated filters shall be disposed of as asbestos waste.
CAPITAL PROJECT NUMBER PO79201K 02081-57
100: CONTRACT DOCUMENTS REV. May 3,2000
- 57 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631306
NYC-WTC_000416818
OCR can misread numbers and units. Confirm readings against the page image before using them.