Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 items shall be removed to the place designated for their storage.

18. Weekly, and more often, if necessary, the Contractor shall inspect all arrangements of materials stored on the site; re-stack and tidy them or otherwise sendee them to meet the requirements of these Specifications.

19. The Contractor shall maintain the site in a neat and orderly condition at all times.

Part 3 - EXECUTION

3.01 WORKER DECONTAMINATION FACILITY

A. Large Asbestos Projects (Small Project Option):

1. Provide a worker decontamination facility in accordance with, Title 15, Chapter 1, OSHA Standard 29 CFR 1926.1101, 12NYCRR Part 56 and as specified herein. Unless approved by NYCDEP and the City, worker decontamination facilities shall be attached to the Work Areas

a) Structure:

(1) Use modular systems or build using wood or metal frame studs, joists, and rafters placed at a maximum of 16 inches on-center.

(2) When worker decontamination unit is located outdoors, in areas with public access, or in correctional facilities, frame work shall be lined with minimum 3/8” thickness plywood sheathing. Sheathing shall be caulked or taped airtight at all joints and seams.

(3) Interior shall be covered with two layers of opaque 6-niil polyethylene sheeting, with a minimum overlap of 16 inches at seams. Seal seams airtight using tape and adhesive. The interior floor shall be covered with two (2) layers of reinforced fire- retardant polyethylene sheeting with a minimum overlap on the walls of sixteen inches.

(4) Entrances to the decontamination unit shall be secured with lockable hinged doors. Doors shall be open at all times when abatement operations are in progress. Doors shall be louvered to allow for air movement through the decontamination units into Work Area.

b) Curtained Doorways: A device to allow ingress or egress from one room to another while permitting minimal air movement between the rooms.

c) Air Locks: Air locks shall consist of two curtained doorways placed a minimum of three feet apart.

d) Decontamination Enclosure System shall be placed adjacent to the Work

02082-61

CITY_21 MCI 00_014563917

NYC-WTC_000455988

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455988Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →