NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 105 pages

Police Academy asbestos abatement specifications, DDC

Machine-extracted title · confidence 48%

Contract specs for abatement of asbestos-containing materials at Police Academy.

NYC-WTC_000416762–000416866
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement

13. The Contractor shall not allow accumulation of scrap, debris, waste material, and other items not required for use in this work, When asbestos contaminated waste must be kept on the work site overnight or longer, it shall be double bagged and stored in tightly closed and sealed fiber drums, placed inside or outside the contaminated area.

14. At least twice a week (more if necessary), the Contractor shall completely remove all scrap, debris and waste material from the job site.

15. The Contractor shall provide adequate storage space for all items awaiting removal from the job site, observing all requirements for fire protection and concerns for the environment.

16. All respiratory protection equipment shall be selected from the latest NIOSH Certified Equipment list.

17. Daily and more often, if necessary, the Contractor shall inspect the Work Areas and adjoining spaces, and pick u all scrap, debris, and waste material. Al such items shall be removed to the place designated for their storage.

18. Weekly, and more often, if necessary, the Contractor shall inspect all arrangements of materials stored on the site; re-stack and tidy them or otherwise service them to meet the requirements of these Specifications.

19. The Contractor shall maintain the site in a neat and orderly condition at all times.

Part 3 - EXECUTION

3.1 WORKER DECONTAMINATION FACILITY

A. Large Asbestos Projects (Small Project Option):

1. Provide a worker decontamination facility in accordance with. Title 15, Chapter 1, OSHA Standard 29 CFR 1926.1101, 12NYCRR Part 56 and as specified herein. Unless approved by NYCDEP and the City, worker decontamination facilities shall be attached to the Work Areas

a) Structure:

(1) Use modular systems or build using wood or metal frame studs, joists, and rafters placed at a maximum of 16 inches

CAPITAL PROJECT NUMBER PO79201K 02081-54 100: CONTRACT DOCUMENTS REV. May 3,2000 - 54 -100% CONTRACT DOCUMENTS REV. 0: DATE

CITY_21MC100_006631303

NYC-WTC_000416815

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000416815Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →