NYC 9/11 Public Portal Document
SECTION 02082
Part 3 - EXECUTION
3.01 WORKER DECONTAMINATION FACILITY
A. Large Asbestos Projects (Small Project Option):
1. Provide a worker decontamination facility in accordance with, Title 15, Chapter 1, OSHA
Standard 29 CFR 1926.1101, 12NYCRR Part 56 and as specified herein. Unless
approved by NYCDEP and the City, worker decontamination facilities shall be attached
to the Work Areas
a) Structure:
(1) Use modular systems or build using wood or metal frame studs, joists, and
rafters placed at a maximum of 16 inches on-center.
(2) When worker decontamination unit is located outdoors, in areas with
public access, or in correctional facilities, frame work shall be lined with
minimum 3/8” thickness plywood sheathing. Sheathing shall be caulked or
taped airtight at all joints and seams.
(3) Interior shall be covered with two layers of opaque 6-mil polyethylene
sheeting, with a minimum overlap of 16 inches at seams. Seal seams
airtight using tape and adhesive. The interior floor shall be covered with
two (2) layers of reinforced fire-retardant polyethylene sheeting with a
minimum overlap on the walls of sixteen inches.
(4) Entrances to the decontamination unit shall be secured with lockable
hinged doors. Doors shall be open at all times when abatement operations
are in progress. Doors shall be louvered to allow for air movement through
the decontamination units into Work Area.
b) Curtained Doorways: A device to allow ingress or egress from one room to
another while permitting minimal air movement between the rooms.
c) Air Locks: Air locks shall consist of two curtained doorways placed a minimum
of three feet apart.
d) Decontamination Enclosure System shall be placed adjacent to the Work Area
and shall consist of three totally enclosed chambers, separated from Work Area
and each other by airlocks, as follows:
(1) Equipment Room: The equipment room shall have a curtain doorway to
separate it from the Work Area, and share a common airlock with the
shower room. The equipment room shall be large enough to accommodate
at least one worker (allowing them enough room to remove their
protective clothing and footwear), and a 6-mil disposal bag for collection
of discarded clothing and equipment. The equipment room shall be
utilized for the storage of equipment and tools after decontamination using
02082-61
CITY_21 MCI 00_014563834
NYC-WTC_000454634
OCR can misread numbers and units. Confirm readings against the page image before using them.