SECTION 02082
a HEPA-vacuum and/or wet cleaning. A one-day supply of replacement
filters, in sealed containers, for HEPA-vacuums and negative air
machines, extra tools, containers of surfactant, and other materials and
equipment required for the project shall be stored here. A walk-off pan
filled with water shall be placed in the Work Area just outside the
equipment room for persons to clean foot coverings when leaving the
Work Area. Contaminated footwear and reusable work clothing shall be
stored in this room.
(2) Shower Room: The shower room shall have two airlocks (one that
separates it from the equipment room and one that separates it from the
clean room). The shower room shall contain at least one shower, with hot
and cold water adjustable at the tap, per eight workers. Careful attention
shall be given to the shower to ensure against leaking of any kind.
Contractor shall supply towels, shampoo and liquid soap in the shower
room at all times. Shower water shall be drained collected, and filtered
through a system with at least a 5-micron particle size collection capacity.
A system containing a series of several filters with progressively smaller
pore sizes shall be used to avoid rapid clogging of the filters by large
particles. Filtered water shall be discharged in accordance with applicable
codes. Contaminated filters shall be disposed of as asbestos waste.
(3) Clean Room: The clean room shall share a common airlock with the
shower room and shall have a curtained doorway to separate it from
outside non-contaminated areas. Lockers, for storage of workers' street
clothing, and shelves, for storing respirators, shall be provided in this area.
Clean disposable clothing, replacement filters for respirators, and clean
dry towels shall be provided in the clean room. The clean room shall not
used for the storage of tool, equipment or other materials.
B. Small Asbestos Projects
1. Provide a worker decontamination facility in accordance with, Title 15, Chapter 1, OS HA
Standard 29 CFR 1926.1101, 12NYCRR Part 56 and as specified herein. Unless
approved by NYCDEP and the City, worker decontamination facilities shall be attached
to the Work Areas.
a) Structure:
(1) Use modular systems or build using wood or metal frame studs, joists, and
rafters placed at a maximum of 16 inches on-center.
(2) When worker decontamination unit is located outdoors, in areas with
public access, or in correctional facilities, frame work shall be lined with
minimum 3/8” thickness plywood sheathing. Sheathing shall be caulked or
taped airtight at all joints and seams.
(3) Interior shall be covered with two layers of opaque 6-mil polyethylene
sheeting, with a minimum overlap of 16 inches at seams. Seal seams
02082-62