NYC 9/11 Public Portal Document
Asbestos Abatement
with water shall be placed in the Work Area just outside the
equipment room for persons to clean foot coverings when
leaving the Work Area. Contaminated footwear and
reusable work clothing shall be stored in this room.
(2) Shower Room: The shower room shall have two airlocks
(one that separates it from the equipment room and one that
separates it from the clean room). The shower room shall
contain at least one shower, with hot and cold water-
adjustable at the tap, per eight workers. Careful attention
shall be given to the shower to ensure against leaking of
any kind. Contractor shall supply towels, shampoo and
liquid soap in the shower room at all times. Shower water
shall be drained collected, and filtered through a system
with at least a 5-micron particle size collection capacity. A
system containing a series of several filters with
progressively smaller pore sizes shall be used to avoid
rapid clogging of the filters by large particles. Filtered
water shall be discharged in accordance with applicable
codes. Contaminated filters shall be disposed of as asbestos
waste.
(3) Clean Room: The clean room shall share a common airlock
with the shower room and shall have a curtained doorway
to separate it from outside non-contaminated areas.
Lockers, for storage of workers' street clothing, and
shelves, for storing respirators, shall be provided in this
area. Clean disposable clothing, replacement filters for
respirators, and clean dry towels shall be provided in the
clean room. The clean room shall not used for the storage
of tool, equipment or other materials.
B. Small Asbestos Projects
1. Provide a worker decontamination facility in accordance with. Title 15,
Chapter 1, OSHA Standard 29 CFR 1926.1101, 12NYCRR Part 56 and as
specified herein. Unless approved by NYCDEP and the City, worker
decontamination facilities shall be attached to the Work Areas.
a) Structure:
(1) Use modular systems or build using wood or metal frame
studs, joists, and rafters placed at a maximum of 16 inches
on-center.
(2) When worker decontamination unit is located outdoors, in
CAPITAL PROJECT NUMBER PO79201K 02081-56
100: CONTRACT DOCUMENTS REV. May 3,2000
- 56 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631305
NYC-WTC_000416817
OCR can misread numbers and units. Confirm readings against the page image before using them.