SECTION 02082
airtight using tape and adhesive. The interior floor shall be covered with
two (2) layers of reinforced fire-retardant polyethylene sheeting with a
minimum overlap on the walls of sixteen inches.
(4) Entrances to the decontamination unit shall be secured with lockable
hinged doors. Doors shall be open at all times when abatement operations
are in progress. Doors shall be louvered to allow for air movement through
the decontamination units into Work Area.
b) Curtained Doorways: A device to allow ingress or egress from one room to
another while permitting minimal air movement between the rooms.
c) Air Locks: Air locks shall consist of two curtained doorways placed a minimum
of three feet apart.
d) Decontamination Enclosure System shall be placed adjacent to the Work Area
and shall consist of three totally enclosed chambers, separated from Work Area
and each other by airlocks, as follows:
(1) Shower Room: The shower room shall have two airlocks (one that
separates it from the work area and one that separates it from the clean
room). The shower room shall contain at least one shower, with hot and
cold water adjustable at the tap, per eight workers. Careful attention shall
be given to the shower to ensure against leaking of any kind. Contractor
shall supply towels, shampoo and soap in the shower room at all times.
Shower water shall be drained collected, and filtered through a system
with at least a 5-micron particle size collection capacity. A system
containing a series of several filters with progressively smaller pore sizes
shall be used to avoid rapid clogging of the filters by large particles.
Filtered water shall be discharged in accordance with applicable codes.
Contaminated filters shall be disposed of as asbestos waste.
(2) Clean Room: The clean room shall share a common airlock with the
shower room and shall have a curtained doorway to separate it from
outside non-contaminated areas. Lockers, for storage of workers' street
clothing, and shelves, for storing respirators, shall be provided in this area.
Clean disposable clothing, replacement filters for respirators, and clean
dry towels shall be provided in the clean room. The clean room shall not
used for the storage of tool, equipment or other materials.
C. Decontamination Enclosure System Utilities: Lighting, heat, and electricity shall be provided as
necessary by the Contractor, and as specified herein.
3.02 Waste Decontamination FACILITY
A. Large Asbestos Project (Small Project Option)
1. Provide a worker decontamination facility in accordance with, Title 15, Chapter 1, OS HA
Standard 29 CFR 1926.1101, 12NYCRR Part 56 and as specified herein. Unless