Asbestos inspection report, 102-104 Greenwich Street

Machine-extracted title · confidence 95%

Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.

NYC-WTC_000128550–000128593

Folder label: “102 GREENWICH 1001054, 53/37

Page image
Scanned page image, NYC-WTC_000128567
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

C. DECONTAMINATION PROCEDURES

1. The contractor shall provide an adequate decontamination unit consisting of a serial arrangement of rooms or spaces adjoining the work area or a decontamination trailer. Each airlock shall be clearly identified and separated from the other by three polyethylene crossover sheet doors designed to minimize fiber and air transfer as people pass between areas. A minimum of two layers of polyethylene sheeting shall be required for floors, walls, and the ceiling for on- site constructed decontamination units. Polyethylene crossover sheet doors shall have at least three layers of polyethylene sheeting and be weighted so as to fall into place when people pass through the area. Decontamination chamber doors shall .be of sufficient height and width to enable replacement of equipment that may fail and to safely stretcher or carry an injured worker from the site without destruction of the chamber or unnecessary risk to the. integrity of the work area. Such doors must be at least four feet wide, and the distance between sets of doors must be at least four feet.

2. The decontamination unit shall consist of the following:

i. Clean room: In this room persons remove and leave all street clothes and put on clean disposable coveralls. Appropriate NIOSH approved respiratory protection equipment is also picked up in this area. No asbestos contaminated items are permitted in this room. The front entrance shall be equipped with a lockable louvered door to prevent unauthorized entry.

ii. Shower room: this is a separate room used for transit by cleanly dressed people entering the work area from the clean room and for showering by them after they have undressed in the equipment room. This is a contaminated area.

iii. Equipment room: Work equipment, footwear, and all other contaminated work clothing shall be stored here. This is also a change and transit room for people. All areas between the shower room and work area shall be considered part of the equipment room. This is a contaminated area.

iv. Each room shall be separated by individual airlock.

3. In order to prevent contamination of the environment, the contractor shall be responsible for controlling access at the work area and shall maintain a daily log of personnel entering the work area. A list of names of workers shall be posted with, their start and stop times for each day. In addition, the contractor shall ensure that all persons who enter the work area shall observe the following work area entry and exit procedures.

NYC-WTC 000128567

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128567Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127792

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

11 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975

machine-extracted · confidence unavailable · Check page ↗
Asbestos Project Notification Form · Box DEP Box 52

NYC-WTC_000127779

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

11 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000104853 · Box DEP Box 36

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

Cited alongside this record in an Ask answer