NYC 9/11 Public Portal Document Oct 02 200i 2 I ’
TO: Commissioner Miele 718-595-3525 EC; First Deputy Commissioner Chapin 718-595-3557 Deputy Commissioner Aval iron! 718-595-4544 Deputy Commissioner GreeUy 718-595-5342 Deputy Commissioner Lopez 718-595-6950 Deputy Comi^sioner Principe 914-741-0348 FROM: Paul Bennett^! 7-769-1282 RE: WTC Daily Report for 10/22/01 DATE: Oct. 22,2001 via FAX Summary of outstanding activities mr 10/22/01.
FDNY HazMat has offered to speak to DEP Upstate HazMat regarding resplonse to suspicious package protocol. Alike: Please let me know if you want to take FDNY up on tlieir offer?
OEM requests assistance in design and installation of storm water runoff form their new HQ. Update: BWSO to assist. OEM has requested assistance in design and installatiGn of a storm water management system for their new facility being built in Gravesend, BK 01’13 St & Tve Zf Apparently, a large parking lot is being constructed and OEM has askedfor assistance in installing catch basins /storm drains. A this something for DEP or DDC?
Health and Safetj^ meeting EPA detected low levels of Freon 22 at two locations. FYI - EP A detected Freon 22 at concentrations up to 48 ppm on the pile at the North power and 46 WTC locations.
ft of water to be / is being pumped from the WTC EPA requested DEP HazMat to conduct the sampling. M. Fawzy to make a i aiigeinents, -^■'dirional sampling and analysis of the water in the basement will be conducted by EFA. b: lustrial Waste is working with DDC and their contractor on developing a plan. DDC did not identify when deyvatering would begin. NYSDOH Jim Covey and NYSDEC questioned the quality of the water to be / is being pumped outfyom the basements of the WTC and from the EA tunnel and into the sewers. DEC has indicated that they are willing to take the lead on this issue (fdan, protocol and ultimate disposal), hut they need NYC to ask for such assistance.
Dust Control Update- Dust control continues to be problematic despite my efforts in speaking to contractor foremen on site, discussions at the 9:00 AM DDC/Contractor meeting and the 6:00 PM Health and Safety Meeting. I’ve begun to document dust suppression activities in support of ray comments made at the raeetings.
Manpower hours for EMRP on 10/22/01: Paul Bennett Pier 92 11:00 AM - 11:00 PM 12 hl’S Frank Vazquez Command Bus off Robert Kepi cl : Command Bus 12:00 PM - 12:00 AM 1.2 hl'S Joe Scafidi Cottunaad Bus 12:00 AM - 12:00 PM 12 hrs -end-
CITY_21MC100_003731448
NYC-WTC_000362269
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000307984
Outlining outstanding activities and requests for stormwater and OEM involvement.
10 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247487
Update on OEM storm water runoff system design and installation at Gravesend facility.
10 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209380
Memo requesting DEP assistance for storm water runoff design and installation at the OEM new facility in Gravesend.
8 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307985
Summary of stormwater and drainage system needs for OEM facility near Gravesend.
7 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247486
Summary of outstanding activities including storm water management at new OEM HQ site.
8 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154487
Daily report noting OEM requests for assistance in designing and installing a storm water management system.
8 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455925
Daily OEM report detailing stormwater, site safety, and sampling planning actions.
8 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455462
Daily WTC operations briefing and stormwater/ID requests for new HQ.
8 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154442
Summary of outstanding activities for 10/10/01 including cell phone tower placement investigation and pending technical authority site investigation report.
8 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154438
Memo summarizing daily activities including a stray current investigation site visit on October 9, 2001.
5 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154444
Memo summarizing daily activities including a FEMA meeting request on October 11, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154437
Memo summarizing daily activities including public calls and emergency operations closure on October 3, 2001.
2 shared non-person entities · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000307984
Outlining outstanding activities and requests for stormwater and OEM involvement.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247487
Update on OEM storm water runoff system design and installation at Gravesend facility.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154487
Daily report noting OEM requests for assistance in designing and installing a storm water management system.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455925
Daily OEM report detailing stormwater, site safety, and sampling planning actions.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455462
Daily WTC operations briefing and stormwater/ID requests for new HQ.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154484
Memo summarizing daily activities including an OEM request for storm water system assistance on October 19, 2001.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000307984
Outlining outstanding activities and requests for stormwater and OEM involvement.
Similar indexed content
NYC-WTC_000247487
Update on OEM storm water runoff system design and installation at Gravesend facility.
Similar indexed content
Daily report noting OEM requests for assistance in designing and installing a storm water management system.
Similar indexed content
NYC-WTC_000455925
Daily OEM report detailing stormwater, site safety, and sampling planning actions.