WTC storm water system design update, Gravesend BK

Machine-extracted title · confidence 35%

Update on OEM storm water runoff system design and installation at Gravesend facility.

NYC-WTC_000247487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Fax:212-259-9802 Oct 22 2001 22:23 P.Ol /e

TO: Commissioner Miele 718-595-3525 CC: First Deputy Commissioner Chapin 718-595-3557 Deputy Commissioner Avaltroni 718-595-4544 Deputy Commissioner Greeley 718-595-5342 Deputy Commissioner Lopez 718-595-6950 Deputy Comm^sioner Principe 914-741-0348 FROM: Paul Bennett Wl 7-769-1282 RE; WTC Daily Report for 10/22/01 DATE: Oct. 22,2001 via FAX Summary of outstanding activities for 10/22/01.

FDNY HazMat has offered to speak to DEP Upstate HazMat regarding respionse to suspicious package protocol. Mike: Please let me know if you want to take FDNY up on their offer?

OEM requests assistance in design and iustaUatieu of storm water runoff form their new HQ. Update; BWSO to assist. OEM has requested assistance in design and installation ofa storm water management system frir their newfacility being built in Gravesend, BK (WI3 St & Ave Zf Apparently, a large parking lot is being constructed and OEM has askedfor assistance in installing catch basins / storm drains. Is this somethingfrr DEP or DDC?

Health and Safety meeting EPA detected low levels of Freon 22 at two locations. FYI - EPA detected Freon 22 at concentrations up to 48 ppm on the pile at the North Tower and #6 WTC locations.

Quality of water to be / is being pumped from the WTC Update: EPA requested DEP HazMat to conduct the sampling. M. Fawzy to make arrangements. Additional sampling and analysis of the water in the basement will be conducted by EPA. Industrial Waste is working with DDC and their contractor on developing a plan. DDC did not identify when dewatering would begin. NYSDOH Jim Covey and NYSDEC questioned the quality ofthe water to be/ is being pumped outfrom the basements ofthe WTC andfrom the PA tunnel and into the sewers. DEC has indicated that they are willing to take the lead on this issue (plan, protocol and ultimate disposal), but they need NYC to askfor such assistance.

Dust Control Update: Dust control continues to be problematic despite my eftorts in speaking to contractor foremen on site, discussions at the 9:00 AM DDC/Contractor meeting and the 6:00 PM Health and Safety Meeting, I’ve begun to document dust suppression activities in support of my comments made at the meetings.

Manpower hours for EMRP on 10/22/01; Paul Bennett Pier 92 11:00 AM-Tl:00 PM 12 hrs Frank Vazquez Command Bus off Robert Kepich Command Bus 12:00 PM-12:00 AM 12 hrs Joe Scafidi Command Bus 12:00 AM-12:00 PM 12 hrs -end-

NYC-WTC_000247487

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000247487Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →