WTC daily activities, Oct 19 2001

Machine-extracted title · confidence 45%

Summary of stormwater and drainage system needs for OEM facility near Gravesend.

NYC-WTC_000307985
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

" 5X: Get 19 2001 22:0' P.Cl

TO: Commissioner Miele 718-595-3525 CC; First Deputy Commissioner Chapin 718-595-3557 Deputy Commissioner Avaltroni 718-595-4544 Deputy Commissioner Greeley 718-595-5342 Deputy Commissioner Lopez 718-595-6950 Deputy Commi^ioner Principe 914-741-0348 FROM; RE: Paul Bennett WTC Daily R^^rt for 10/19/01 5 p/' DATE: Oct, 19,2001 via FAX Summary of outstanding activities for 10/19/01.

OEM requests assistance in design and installation of storm water runoff form their new HQ. OEM has requested assistance in design and installation of a storm water management system for their new facility being built in Gravesend, BK (W13 St & Ave Z). Apparently, a large parking lot is being constructed and OEM has asked for assistance in installing catch basins / storm drains. Is this something for DEP or DDC?

Health and Safety meeting Quality of water to be / is being pumped from the WTC Update: Additional sampling and analysis of the water in the basement will be conducted by EPA. Industrial Waste is working with DDC and their contractor on developing a plan. DDC did not identify when dewatering would begin. l^fYSDOH Jim Covey and NYSDEC questioned the quality of the water to be / is being pumped out from the basements of the WTC andfrom the PA tunnel and into the sewers. DEC has indicated that they are willing to take the lead on this issue ^lan, protocol and ultimate disposal), but they need NYC to askfor such assistance. Diana /Al /Doug ~ How do you want me to handle? Please contact me.

Dust Control Dust control was reported as very good at two of the WTC contractors’ sites while it was reported as fair to poor at the other two WTC sites. Dust suppression consultant has not yet started.

At the request of Mike Gilseoan, I informed EPA of debris on the road / sidewalk on N?E/C of Albany St between South End Ave and West St. and asked for their contractors to clean this area.

Training Opportunity The International Union of Operating Engineers will be conducting a seminar on “Trenching and excavation safety, soil analysis, use of protective systems and the requirements of OSHA 1926,650-2 standard excavations and new ANSI standards Al0.12 excavation’’ on Sunday, Oct. 21 at 9:00 AM at PS 39, All aie welcome.

OSHa sampling Results Summary as of 10/19 attached. Manpower hours for EMRP on 10/19/01: Paul Bennett Pier 92 10:30 AM-10:30 PM 12 hrs Frank Vazquez Command Bus 12:00 AM-12:00 PM 12 hrs Robert Kepich Command Bus 12:00 PM- 12:00 AM 12 hrs Joe Scafidi Command Bus off -eud-

CITY_21MC100_011098862

NYC-WTC_000307985

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000307985Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

WTC daily report, 10/19/01

NYC-WTC_000455925

Daily OEM report detailing stormwater, site safety, and sampling planning actions.