NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

discuss equipment restrictions, staging, storage and access issues, stormwater management and E&S control; plans and special notes were received on 8/24/98; site inspection conducted on 8/25/98. A causeway is proposed to be constructed at the Route 268 site to provide access to the structure when water levels are low; plans are under review. On 9/14/98, DEP issued a comment letter to DOT addressing reservoir intake protection, road drainage and stormwater management issues, clearing/grading of access roads, and bulkhead construction; additional comments are forthcoming. DEP conducted inspections of the proposed staging and access areas for these bridge reconstruction projects on 6/16/99, and provided comments to OWSL on 6/24/99. DEP attended an on-site meeting on 7/28/99 with representatives of DOT and Cianbro Corporation to discuss adjustments to the proposed staging and access areas for NYS Route 10 bridge reconstruction project. DEP will reply to Cianbro representatives upon approval of the revised access and staging area plan by Operations and DWQC-Limnology staff. DEP issued a memorandum to OWSL on 10/21/99 with recommended special conditions for the proposed revisions to the staging and access areas for the Route 10 Bridge over Cannonsville Reservoir. Mobilization of equipment. Project to commence Spring, 2000. DEP received a copy of the 1/10/00 Revokable Use Permit Application and Sketch Plans submitted to OWSL by NYSEG for the power line extension that will serve the temporary field offices of Cianbro Corporation. A copy of this package was forwarded to DEP District Engineer on 1/28/00. DEP conducted a site inspection on 2/10/00. The proposed electric line route will cross moderate to steep slopes and a wetland/watercourse area. Electric poles will be installed on an embankment above an existing pond. On 2/11/00, a memorandum was issued to OWSL with recommendations for protecting these areas. DEP reviewed the Water Quality Protection Plan and Emergency Spill Response Plan (Hazardous Material/Waste, Petroleum and Chemical Contingency Plan Procedure) received fi-om Cianbro Corporation on 3/2/00 for the rehabilitation of the NYS Route 10 (BIN 1007670) and NYS 268 (BIN 1050580) bridges over Cannonsville Reservoir. DEP issued a letter to DOT on 3/27/00 addressing lead waste control and storage, fuel management and spill prevention/control, and hazardous spill response issues. 3/29/00; Contractor has completed mobilization. Office trailers are on site with temporary power service completed. Bridge will be closed to the public 4/3/00. An on-site meeting will be held 4/3/00 with DEP, DOT, and the contractor to “kick-off’ the project. Erosion control measures will commence 4/3/00. DEP received revised Water Quality Protection Plans incorporating comments contained in our 3/27/00 letter to DOT. 4/3/00: Bridge closed to the public. 4/28/00; Mobilization completed, bridge demolition in progress. DEP reviewed the Water Quality Protection Plans and Emergency Spill Response Plans received from Cianbro on 4/20/00, and issued a letter on 5/16/00 stating that all outstanding issued raised in our 3/27/00 letter had been addressed. On 5/22/00, DEP received a letter from DOT outlining the proposed asbestos contrc methods that will be used to handle the asbestos-bearing paint which was identified at the Routt 10 bridge site. The letter stated that Sunstream of Binghamton would be the asbestos subcontractor. DEP reviewed the submitted materials and issued a letter to DOT on 5/25/00 stating the proposed containment and disposal measures will be sufficient to control the asbestc impregnated lead waste. 5/31/00; Demolition in progress approximately 10% complete. 6/30/00: Demolition continues. Work schedule will increase to an 68 hour work week beginnir 7/5/00 to remain on schedule. Delay was due to unforeseen asbestos paint issues. Bridge demolition and asbestos control is underway. 7/27/00: Demolition 75% complete. 8/28/00: DEP received notes on the Substructure Pour Procedure from Cianbro Corporation. Demolitior 95% complete. Reconstruction underway. 9/28/00; Demolition 100% complete. Reconstruction 50% complete. On 10/13/00, DEP issued a letter to DOT stating that the procedure described by Cianbro Corporation for the Superstructure Pour Plan appeared to be acceptable, and noting that any field changes should be reviewed and approved by DEP prior t<

44 NYC-WTC_000291070

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291070Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →