NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 33 pages

Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Date- 03/31/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster #: 1391

P.A. ID; 061-51000-19 Applicant; NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant -aUnsD—---------- S PW WAS PREPARED. THE CONTRACT HAD NOT YET BEEN AWARDED. BID AND PROPOSAL DOCUMENTS WILL BE ON FILE AT DOC'S OFFICE THE REPAIR WORK INCLUDES: REMOVE AND REPLACE 850 LF OF CURB, 300 SF OF SPALLED CONCRETE 300 LF OF STAIR NOSING, 77 LF OF CONCRETE STEPS, AND 1600 SF OF CONCRETE TOPPING SLAB IN PLAZA, REMOVE 700 LF OF PERIMETER FENCING RFPI ACE 42 STEEL BOLLARDS AND 375 LF OF CHAIN, FABRICATE AND INSTALL 8 WOOD BENCHES(4'X14'X2') AND REPLACE 16 LAMP POSTS WITH ALL ELECTRICAL WORK. IN ADDITION TO THE ELIGIBLE WORK DESCRIBED THE WORK AT LIBERTY PARK INCLUDES SOME INELIGIBLE WORK AS WELL: EXCAVATE AND REMOVE TREE STUMPS FROM 68 -6' X 6' TREE PIT AREAS PLANT TREES (QUANTITY AND SIZES TO BE DETERMINED). AND INSTALL CONDUIT. WIRING. JUNCTION BOXES. OUTLETS AND ’ SWITCHES FOR CONNECTION TO INFORMATION BOOTH (THE INFORMATION BOOTH DID NOT EXIST AT THE TIME OF THE DISASTER). THE ELIGIBLE FUNDING FOR THE REPAIR WILL HAVE TO BE REDUCED DURING THE FINAL RECONCILIATION OF THIS PW TO ACCOUNT FOR THE INELIGIBLE WORK. THIS WORK SHOULD BE COMPLETED BY THE END OF July.

A PERMANENT LIGHTiNG/POWER SYSTEM WAS INSTALLED AROUND THE SITE AND BECAME OPERATIONAL DURING THE LAST WEEK IN February. A DETAILED SCOPE OF WORK DESCRIPTION WAS INCLUDED AS AN ATTACHMENT TO PW 870 SINCE THE ORIGINAL CONTRACT FOR THIS WORK WAS AWARDED. THERE HAVE BEEN A NUMBER OF CHANGE ORDERS TO AUGMENT THE POWER AND LIGHTING NEEDS AT THE SITE DUE IN GENERAL TO SAFETY CONCERNS. CHANGE ORDER DOCUMENTS ARE ON FILE AT DDC'S OFFICE. AS EARLIER DISCUSSED. OWNERSHIP OF THIS SYSTEM WILL BE TRANSFERRED TO THE PA ON OR AROUND June 30. 2002. AT THAT TIME OPERATION AND MAINTENANCE OF THAT SYSTEM WILL BE THE RESPONSIBILITY OF THE PA.

RECORDS OF WORK COMPLETED BY BOVIS/AMEC ARE ON FILE WITH THE DDC. IN ADDITION TO THE WORK DESCRIBED ABOVE BOVIS/AMEC. THEIR SUBCONTRACTORS AND THEIR CONSULTANTS. WERE INVOLVED IN THE FOLLOWING WORK:

• CONTINUE TO DEMOLISH COLUMN TREES AT S. TOWER (S-W) •: CONTINUE TO REMOVE DEBRI S BETWEEN BUILDINGS 2& 3 AND COMPLETE DEMOLITION OF BUILDING 2 TO GRADE (WTC 2&3 ) ■| A CAST-IN-PLACE REINFORCING WALL,(ALONG SOUTH-EAST CORNER OF SLURRY WALL) IS BEING CONSTRUCTED ON A T&M BASIS. NOT TO EXCEED $1,390,000 THIS EMERGENCY WORK WAS NECESSARY TO STABILIZE A DAMAGED PORTION OF THE EXISTING SLURRY WALL. THE WORK WAS BID WAS AWARDED TO CIVETTA COUSINS JV AND SHOULD BE COMPLETED BY 7-15-02 (BID AND PROPOSAL DOCUMENTS ATTACHED) •: iOEMOBILIZATION (EQUIPMENT.TRAILERS ECT.) - THERE WILL BE A PHASED DEMOBILIZATION. A LARGE PORTION SHOULD BE COMPLETED BY June 30. 2002. HOWEVER. SOME WORK WILL CONTINUE INTO July (DDC WILL CONTINUE TO PROVIDE SITE SECURITY THROUGHOUT THE DEMOBILIZATION IN THE IMPACTED ZONE) 'DEBRIS REMOVAL FROM ROOFS AND SIDEWALKS AT THE FOLLOWING PRIVATE BUILDINGS: 120 WEST STREET 125 CEDAR STREET. 130 CEDAR STREET. 85 WEST STREET. 90 WEST STREET, 4 Albany STREET, 110 GRENWICH STREET 110 Washington STREET, 40 RECTOR STREET, 130 LIBERTY STREET, AND 30 WEST Broadway ■: (EMERGENCY STRUCTUFAL STABILIZATION WORK AT 130 CEDAR, 90 WEST, AND 30 WEST Broadway T (CONTINUE TO CORE AND INSTALL TIE BACKS @ SLURRY WALL, TO STABILIZE WALL, AND INSTALL INSTRUMENTS TO MONITOR WALL MOVEMENT. INSTALL DEWATERING WELLS TO RELIEVE PRESSURE AND DECOMMISSION WELLS AS WELLS ARE NO LONGER NEEDED. •UCONTINUE TO DEMOLISH BUILDING 6 SLABS •i iWFB SITF/DATABASE DEVELOPMENT FOR TIME, MATERIALS, EQUIPMENT TRACKING • (UPDATE THE LOGISTICS PLAN REGULARLY •' (CONTINUE TO MONITOR TRUCKING USING GPS TRAFFIC MONITORING SYSTEM •POPERATE WASH STATION DISMANTLE AND SET UP WASH STATION AS NEEDED TO MEET CHANGING LOGISTICS PLAN •I iSITE PREP FOR TRANSITION OF SITE TO THE PORT AUTHORITY,(CLEANING OF SITE, FENCE INSTALLATION RETAINING WALL FOR SIDEWALK ALONG CHURCH ST., PAINTING, TEMP PAVING FOR DUST SUPPRESSION.) •( (EMERGENCY REPAIRS TO BUILDING 4 AND 5 SLABS AS NEEDED TO PREVENT WATER INFILTRATION

THE MA.IORi rY OF THIS WORK IS SCHEDULFO FOR COMPLETION ON OR AROUND June 30, 2002.

Page 15 of 311

NYC-WTC_000251111

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251111Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →