Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY Date 03/31/2003 Project Completion and Certification Report (P.4)

Disaster #-.1391

P A ID 001-51000-19 Applicant: NEW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF

PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl, Date Amt. Compl. Completed by Applicant at Insn. AGREEMENT STATING THIS, INCLUDING A DETAILED LIST OF THE FACILITIES AND THE INITIAL COST OF EACH FACILITY IS CURRENTLY BEING DEVELOPED BY THE PA AND DDC. DDC WILL HAVE TO PRODUCE THIS AGREEMENT WHEN FEMA is' PERFORMING THE FINANCIAL RECONCILIATION OF THIS PW.

DEBRIS REMOVAL ACTIVITIES

BOVIS/AMEC WAS TASKED WITH THE CONTINUATION OF THE REMOVAL OF THE CONCRETE DEBRIS STEEL DFBRIS AND othfr wXd XTcTnTER electrical AND MISCELLANEOUS MATERIAL FROM THE

DURING THE PERIOD ADDRESSED UNDER THIS PW, ALL RESULTING DEBRIS FROM THE OPERATION WAS TRANSPORTED Rv the CM, OR A SUBCONTRACTOR TRANSPORTED TO THE CM, TOKILLS THE FRESH TO PIER 25. LANDFILL. ONCE PIER 25 THE WAS MATERIAL CLOSED ARRIVED ON MAY AT PIER 12. 2002 25 IT AFTER MAYWAS PLACED 12 2^2 RARCFS W INnFRpTs AMD waq

TRUCKED DIRECTLY TO THE LANDFILL. (SOME STEEL WAS TRUCKED DIRECTLY TO Kennedy AIRPORT FOR STORAGE TO BE USFD IN THE REMOVALFUTURE AND FOR A MEMORIAL). ONCE TRANSPORTATION THE PORTION DEBRIS WAS OF THIS WORKSHEET TO TRANSFERRED PROJECT WASBARGES OR THE LANDFILL SITE THF utBKls COMPLETED. nFRRiR

AFTER THE CLOSURE OF PIER 25, A LUMP SUM BID IN THE AMOUNT OF $258,000 WAS WON BY TULLY CONSTRI ICTION nn m AREAAT REPAIR DAMAGES VOLLEYBALL THE AND PIER. SOIL REPAIRCOURT. IN BOCCE WORK TO THE PIER REMOVE AND PUTTING AND REPLACE REMOVE INCLUDED, REPLACE GREENS, FROM PLAYGROUND SAND WOOD DAMAGED ^IL CURBINGAND AND JERSEY BARRIERS. THE REPAIRS TO PIER 25 HAVE BEEN COMPLETED. BID AND PROPOSAL DOCUMENTS ARE ATTACHED ’

FROM September 11. 2001, UNTIL MAY 18. 2002, WEEKS MARINE MAINTAINED THE OPERATIONS AT THE PIERS (I E THF (INI OADINC OF ALL TRUCKS, LOADING OF ALL BARGES, AND TRANSPORT OF ALL BARGES TO FRESH KILLS LANDFILL AND REPAIR (DF PIER 75 ). MARINE WEEKS FOR (FUNDING UTILIZED THE USE OF NYC DEPARTMENT THE DOS BARGES IS SANITATION OFCOVERED (DOS) UNDER BARGES A PW AND THEIR OWN FOR DEBRIS TRANSPORTI PREPARED

FOR NO PAYMENT WAS DOSRESPONSIBILITIES MARINE MADE WEEKS ENDED. BY WEEKS TO DOS FOR PERFORMED THE BARGES). TEMPORARY ONCE REPAIRS TOTHE THEBARGES REACHED FOLLOWING THE LANDFILL DOS^BARGES WEFkS DAMACFD

DURING LOADING AND UNLOADING; DS 118. DS 141. AND DS 143 (DETAILED DAMAGE DESCRIPTIONS ATTACHED AS BACK UP Tn THIS PW). WEEKS ALSO PERFORMED REPAIRS TO DAMAGES CAUSED TO BARGES WHILE IN TOW (DS 111 DS 101 DS 162 AN DS 115). THE DETERMINATION REGARDING THE CAUSE OF THE DAMAGE IS BASED ON FEMA'S REVIEW OF THE DAMArF DOCUMENTATION SUBMITTED TO FEMA TO DATE (ATTACHED AS BACK-UP TO THIS PW). FEMA HAS NOT PERFORMED PHYSlCAi DAMAGE INSPECTIONS OF THE BARGES LISTED ABOVE. THE REPAIR OF THE DAMAGES THAT OCCUR WHILE IN TOW IS THF TOWING CONTRACTOR'S (WEEKS) RESPONSIBILITY ACCORDINGLY, FEMA CANNOT FUND THE COSTOF THOSE REPAIRS ANn THAT COST WILL BE DEDUCTED FROM THE TOTAL AMOUNT ELIGIBLE DURING THE FINANCIAL RECONCILIATraN OF TH S PW TO DATE, ONLY THE FROM REIMBURSEMENT REPAIRS TO THE FEMA. BARGES BE IT SHOULD CAUSE NOTEDDURING LOADING THAT AT AND DDC THIS TIME UNLOADING ANDCONCUR DOES NOT LISTED WITH ABOVE ARE Fl iriRI F FEMA'S SsSMFNT FOR OF

«KPONS»C,TV to - . DAMAGES CAUSEO ,N

WORK INCURRED BY THIS CONTRACTOR (I.E., USING HEAVY EQUIPMENT TO AID IN SEARCH AND RESCUE^ WAS INCIDENTAI Tn SI w'I^cXT^PaITo^Th'sX™’' equipment and manpower as directed by THE Clk SI NEW YoTcOPIES

BOVIS/AMEC IS CLOSE TO AWARDING A LUMP SUM CONTRACT FOR THE RESTORATION OF PRIVATELY OWNFD 1IRFRTY PARK WHICH WAS USED AS A STAGING AREA DURING THF DEBRIS REMOVAL OPERATIONS. AT THE TIME THAT THI '

Page 14 of 311

NYC-WTC_000251110

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251110Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →