NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 51/20 DEY STREET 1075702, 80/4
Document / 17 pages

DEP menu form for 20 Dey Street, Dec 2006

Machine-extracted title · confidence 90%

Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.

NYC-WTC_000126218–000126234

Folder label: “20 DEY STREET 1075702, 80/4

Page image
Scanned page image, NYC-WTC_000126223
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No, 3067-0151 PROJECT WORKSHEET Expires April 30. 2001

PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this collection of information unless a valid OMB control number is displayed in the upper right corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: information Collections Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address. DECLARATION NO. PROJECT NO. FIPS NO. DATE CATEGORY FEMA 1391-DR- NY PW #767 061-51000-19 January 7, 2002 A DAMAGED FACIUTY WORK COMPLETE AS OF: World Trade Center (WTC) Complex and Surrounding Facilities .4/12142 100 % APPLICANT COUNTY City of New York. Department of Design and Construction (DOC) New York LOCATION LATITUDE LONGITUDE New York City, New York) 40.71103N 74.01312 W DAMAGE DESCRIPTION AND DIMENSIONS Asa result of the fire and explosion at the WTC, aS seven of Pie buildings that comprise the complex were destroyed and approximately 6 other buildings outside of the complex were damaged Mnrduraly. The City of New York required in edlele conatruWon services. including but not Wilted to demolition of debris and clearance. removal and disposal of debris at and around the WTC complex. This pro)etx worksheet (PW) prinariy addresses Sufditgs 2-WTC, 4-WTC. and 5- WTC. which were destroyed. and several trivet. buildings outside the complex, which were either damaged stnxdtrraly. or sustained high amounts of debris accumulaton, resulting from the destruction of the aforementioned coned structu es. Building WTC-2 (south tower) was approximately 110 stories high (1353 feet) and extended 7 stories underground. Each floor contained a gross ant of approxi silly 43.200 square feet. Construction was steel two and concrete dabs on sleet truss joists. The South Plaza Building (4-WTC) was 9410111$ high and had approximstey 84.500 square feet per Door. The North Plaza Building (5-WiC) was also 9-stories high and had approximately 190,400 square het per floor. (continued)

SCOPE OF WORK Tully Construction Company, Incorporated (Tully) was hired by DDC, as one of four Construction Managers (CMs), for removal of the concrete, steel and other mixed debris from designated areas within the WTC complex. The debris removal and associated work, unless otherwise noted, was performed on a time and materials basis at the WTC complex pursuant to a draft contract with DDC. The work was both self-performed and performed by subcontractors and/or consultants hired by AMEC. Further, from time to time DDC has issued clarifications to the contract and City procedures. These clarifications have been accumulated by DDC in a project specific binder(s) called the "Poll / roc k." These clarifications take precedence over the draft contract. Also, the contract requires certain approvals byte City, ie,staffing plans, billing rates, bid procurements, etc.., these also have been accumulated by DDC for this specific project and is referred to as the "Approvals Book". This PW has been written for debris removal contract work completed during the period of 9/I 1/01-4/12/02. While Tully has submitted payment requisitions for this period detailing their actual costs incurred, DDC has not completed its final review of the requisitions. The DDC has previously provided nine (9) payments totaling S60,500,000 to cover a portion of Tully's projected costs. PW #97 was nreviouslv v for v Does the Scope of Work change the pre-disaster conditions at the site? 0 Yes ® No Special Considerations issues included? ® Yes 0 No Hazard Mitigation proposal included? 0 Yes ® No Is there insurance coverage on this facility? ® Yes ❑ No PROJECT COST ITEM CODE NARRATIVE QUANTITYIUNIT UNIT PRiCE COST 1 9003 Portion of Cost projeon for work completed 1/LS 60.500,000 60,500,000.00 1 9003 Less Miding previously approved 1llS (42000000) 00)

TOTAL COST 16,500,000.00 PREPARED BY: Jeffrey W. Sample TITLE: FEMA Contractor TAC V FEM Form 0.et, 4EP Of - REPLACE$ ALL PREVIOUS EDITWNS.

NYC-WTC 000126223

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000126223Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →