NYC 9/11 Public Portal Document
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No, 3067-0151
PROJECT WORKSHEET Expires April 30. 2001
PAPERWORK BURDEN DISCLOSURE NOTICE
Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing
instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms.
You are not required to respond to this collection of information unless a valid OMB control number is displayed in the upper right
corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to:
information Collections Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472,
Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address.
DECLARATION NO. PROJECT NO. FIPS NO. DATE CATEGORY
FEMA 1391-DR- NY PW #767 061-51000-19 January 7, 2002 A
DAMAGED FACIUTY WORK COMPLETE AS OF:
World Trade Center (WTC) Complex and Surrounding Facilities
.4/12142 100 %
APPLICANT COUNTY
City of New York. Department of Design and Construction (DOC) New York
LOCATION LATITUDE LONGITUDE
New York City, New York) 40.71103N 74.01312 W
DAMAGE DESCRIPTION AND DIMENSIONS
Asa result of the fire and explosion at the WTC, aS seven of Pie buildings that comprise the complex were destroyed and approximately 6 other buildings outside
of the complex were damaged Mnrduraly. The City of New York required in edlele conatruWon services. including but not Wilted to demolition of debris and
clearance. removal and disposal of debris at and around the WTC complex. This pro)etx worksheet (PW) prinariy addresses Sufditgs 2-WTC, 4-WTC. and 5-
WTC. which were destroyed. and several trivet. buildings outside the complex, which were either damaged stnxdtrraly. or sustained high amounts of debris
accumulaton, resulting from the destruction of the aforementioned
coned structu es. Building WTC-2 (south tower) was approximately 110 stories high (1353 feet) and
extended 7 stories underground. Each floor contained a gross ant of approxi silly 43.200 square feet. Construction was steel two and concrete dabs on
sleet truss joists. The South Plaza Building (4-WTC) was 9410111$ high and had approximstey 84.500 square feet per Door. The North Plaza Building (5-WiC)
was also 9-stories high and had approximately 190,400 square het per floor. (continued)
SCOPE OF WORK
Tully Construction Company, Incorporated (Tully) was hired by DDC, as one of four Construction Managers (CMs), for removal of
the concrete, steel and other mixed debris from designated areas within the WTC complex. The debris removal and associated work,
unless otherwise noted, was performed on a time and materials basis at the WTC complex pursuant to a draft contract with DDC. The
work was both self-performed and performed by subcontractors and/or consultants hired by AMEC. Further, from time to time DDC
has issued clarifications to the contract and City procedures. These clarifications have been accumulated by DDC in a project specific
binder(s) called the "Poll / roc k." These clarifications take precedence over the draft contract. Also, the contract
requires certain approvals byte City, ie,staffing plans, billing rates, bid procurements, etc.., these also have been accumulated by
DDC for this specific project and is referred to as the "Approvals Book".
This PW has been written for debris removal contract work completed during the period of 9/I 1/01-4/12/02. While Tully has
submitted payment requisitions for this period detailing their actual costs incurred, DDC has not completed its final review of the
requisitions. The DDC has previously provided nine (9) payments totaling S60,500,000 to cover a portion of Tully's projected costs.
PW #97 was nreviouslv v for v
Does the Scope of Work change the pre-disaster conditions at the site? 0 Yes ® No
Special Considerations issues included? ® Yes 0 No Hazard Mitigation proposal included? 0 Yes ® No
Is there insurance coverage on this facility? ® Yes ❑ No
PROJECT COST
ITEM CODE NARRATIVE QUANTITYIUNIT UNIT PRiCE COST
1 9003 Portion of Cost projeon for work completed 1/LS 60.500,000 60,500,000.00
1 9003 Less Miding previously approved 1llS (42000000) 00)
TOTAL COST 16,500,000.00
PREPARED BY: Jeffrey W. Sample TITLE: FEMA Contractor TAC V