4 shared non-person entities · 1 shared topics · similarity 0.914
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219967
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000219967
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
FEMA No. : 732 OBR Tracking No. : 040-039
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M B. No. 3067-0151 PROJECT WORKSHEET Expires April 30, 2001
PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this collection of information unless a valid 0MB control number is displayed in the upper right corner of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collection Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472, PaperworkReductionProject(3067-0161MJOT&Donotsendyourcompletedforrntothisaddress^ DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 061-51000-22 04/15/02 ■■ E
DAMAGE FACILITY WORK COMPLETE AS OF: Public and Intermediate School 89 School Clean Up 01/10/02 100 % APPLICANT COUNTY New York City, Board of Education New York LOCATION LATITUDE LONGITUDE 201 Warren Street, New York, NY 10282 DAMAGE DESCRIPTION AND DIMENSIONS
The collapse of the World Trade Center (WTC) on September 11, 2001 caused a massive Cloud Of concrete and dust Io impact neighboring buildings blocks away from the World Trade Center complex. Public and Intermediate School 89 (PS/IS 89) is located at 201 Warren Street, approximately three-tenths of a mile from One WTC. The dust cloud from the collapse of One WTC directly impacted the PS/IS 89 facility and covered the building with a layer of dust. Dust and debris entered the building through the ventilation system and through open windows and doors. In addition, PS/IS 89 was also used as an operations center for emergency rescue and recovery workers. Work to dean PS/IS 89 was performed from November 26, 2001 to January 10, 2002.
SCOPE OF WORK
Work complete consists of the expenses incurred by the New York City, Board of Education (BoE) for the work performed by the School Construction Authority (SCA). SCA will be submitting all costs to the BoE for reimbursement. These costs include the contractual work for remediation and restoration of PS/IS 89 on the basis of design, capacity and function of the facility prior to the disaster and in conformity with applicable standards.
School Construction Authority was responsible for the coordination and construction management of the tbntractors performing work at PS/IS 89 related to the collapse of WTC. Costs associated with the work performed by SCA consists of regutar time labor ($2,139.05), including the New York City regular time fringe benefit rate for non-uniform employees of 44.66% ($955.30). Total incurred cost for regular time labor is $3,094.35. Costs associated with the overtime for labor for SCA ($6,030.13), including the New York City overtime fringe benefit rate for non-uniform employees of 10 73% ($647.04), Total incurred cost for overtime labor is $6,677.17.
SCA retained 6 subcontractors to perform duties necessary to remediate and restore PS/IS 89 to its pre-disaster condition. Air Tech Lab, Inc. (Air Tech) performed clean up and remediation operations of the interior of the building. Corinthian Construction Company, Inc. (Corinthian) cleaned debris and dust from the exterior facade, roof, the courtyard and playground. In addition, Corinthian removed gravel from the roof, the roof membrane was then pressure washed, and new gravel was placed on the roof. V&R Mechanical Inc. (V&R) cleaned the HVAC system of dust and debris. ATC Associates. Inc. (ATC) conducted quality control air monitoring and analytical services, as well as visual inspections to determine the presence of fine particulate dust. New York Environmental conductec aggressive sampling and transmission electron microscopy (TEM) analysis of several floors and the HVAC unit. TDX Construction Corporation (TDX) performed construction oversight of all contractual activities to insure quality of work. Total contractual costs submitted to BoE from SCA for this project worksheet is $1,297,805.24.
See Narrative for detailed description of the work performed by SCA and each contractor, as well as their respective costs.
Total costs associated with this project worksheet for contractual work and labor is 51,307,576.76
Does the Scope of Work change the pre-disaster condition at site? □ Yes [X] No Special Consideration issues included? ra Yes □ No Hazard Mitigation proposal included? □ Yes [X] No Is there insurance coverage on facility? El Yes H No PROJECT COST ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST 1 9003 Contract - School Construction Authority 1 / LS $1,297,805.24 $ 1,297,805.24 2 9007 Labor - Regular Time w/ fringe_______ 1 / LS $ 3,094.35 $ 3,094.35 3 9007 Labor - Overtime w/ fringe 1 / LS S 6,677.17 $ 6,677.17
Total $ 1,307,576.76 REMARKS: Project Officer FEMA Form 90-91, SEP 98
CITY_21MC100_009214338
NYC-WTC_000219967
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
6 shared non-person entities · 1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
3 shared non-person entities · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
3 shared non-person entities · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153012
DEP Commissioner transmits preliminary emergency expense estimates for the Bureau of Air, Noise, and related remediation efforts.
1 shared non-person entities · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141295
Formal agreement between EPA and FEMA establishing program scope for World Trade Center indoor air quality assessment, cleaning, and sampling in Lower Manhattan residences with…
1 shared non-person entities · 1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139500
EPA proposes budget and technical activity group details to FEMA including costs for asbestos validation, dioxin monitoring, and metals analysis for WTC.
1 shared non-person entities · 1 shared topics · similarity 0.897
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000136391
Records folder index from Mayor's office covering World Trade Center administrative materials.
3 shared non-person entities · similarity 0.895
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138714
EPA proposes increased data analysis and validation costs for dioxin and metals monitoring in WTC cleanup.
1 shared non-person entities · 1 shared topics · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138615
Proposed EPA/FEMA inter-agency agreement with data analysis and validation costs for dioxin, metals, and asbestos monitoring.
1 shared non-person entities · 1 shared topics · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154143
Contract document between the City of New York DEP and a contractor for supply and services at World Trade Center residential sites.
1 shared non-person entities · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.957 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Similar indexed content
Similar indexed content
NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
Similar indexed content
Similar indexed content