FEDERAL EMERGENCY MANAGEMENT AGENCY
PROJECT WORKSHEET fl O.M,a, No. 3007-0151
Expires April 30.2001
PAPERWORK BURDEN DISCLOSUKE NOTICE
Public reporting burden iter thia form is estimated to avenge 30 minutes. He burden estimate includes the time for reviewing
corner of the forms. Send comments regarding the accuracy of the burden estimate and any sug^stions for reducing the burden to:
Infbimatiaa Collections Management, Fcdcral Emorgoncy Management Agency, SOO C Street SW, Washington. DC 20472,
Paperwork Reduction Pn^ect (3067'0131). NOTE: Do not send your completed finux to dug address.
DECLARATION NO. PROJECT NO. FIPS NO. DATE CATEGORY
HZMAT-8 081.S10C0-28 May 16,2002 A
FEMA. jaai-DR- NY
DAMAGED FACILITY WORK COMPLETE AS OF:
Contracts Related to Interior Building Cleaning In Lower Manhattan
5/18/02 0 %
APPLICANT COUNTY
Department of Environmental Protection (dep) New York
LOCATION LATITUDE LONGITUDE
Lower Manhattan south of Canal Street
DAMAGE DESCRIPTION AND DIMENSIONS
The fires and explosions al the World Trade .Canter (WTC) buildings 1 and 2 resulted In the collapse of Wees towers and Of surrounding buddlnga. The
collapse of tea towars spread a cloud of dust, pulverized concrete, and smoke throughout Lower Manhattan. The force from the collapse pushed this
debris into the interiora of many buildings in Lower Manhattan. Local government agendes have documented die environmental, health, and acBnomio
threat posed by this debris (see Attachment I).
SCOPE OF WORK
This projscl wwkahast la written to reimburse (he Department ef Environmental Protection (OEP) for the estimated cost to initiate and to implemant a
program to perform on-demand indoor cleaning for oocuplsd residential buildinga south of Canal StreeL DEP will procure and put in place the necessary
contracts, and the United Stataa Environmental Protection Agency (USEPA) will administer and supervise the contracts. This project worksheet also
includes related contract costa ter air monitoring and public outreach through a call center. The total estimated amount for this project worksheet is
578.380,500.
The target area Includes ell of Lower Manhattan south of Canal Street This area will be divided into four zones, A through D. Residanis and owners of
buildings located In tee designated area that are concerned that their aparbnents may eontain debris or dust from me esllapee of the WTC buildings shall
submit requests for assistance through a telephone hofllna. Residents and owners can request deaning witein apartmartb and Ccmmcn spaced by
licensed eebestos oontreotere Wim fpllow-up asbestos elr sampling. Residents and owners may also request asbestos air sampling alone. There ere
spproximBtely 31,000 apartments south of Canal Street and it la estimated that roughly 18,000 occupants will request daaning and testing services.
Another 6,000 residentE are expected to ask for testing services alone. Residents are recalvlna non-cash. In-kind emergency assistance which is not
subject to clilzanshipZqualified alien requirements,
(Sas Soopa of Work Continuation Sheet)
Ooes die Scope of Work dimge thepre-disaMcr conditions at die site? □ Yb8 S No
Special Conalderationa issues Inoludcd? IS Y» □ No Hazard MitigatiCB proposal teaiuded? □ Yes H No
Is there insurance coverage w tMe feciuty? □ Yes IS No
PROJECT COST
ITEM CODE NARRATIVE OUANTITY/UNIT UNIT PRICE COST
J__ 8003 Contrsots for Cleaning and Monitoring SarviMS 1 /EA 577,820,000.00
2 8005 Contract ter Can Center Senddias 1/EA $860,900.00
/
/
/
/
/
/
/
/
TOTAL COST
PREPARED BY; Emily Oha^ TITLE: FEMA, Project Otficsr