NYC-WTC_000266254
FEMA worksheet with project and declaration numbers; general form.
3 shared non-person entities · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗Expense and applicant details for NYC/Design and Construction related to disaster project.
NYC-WTC_000251095–000251127OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Dule: 03/31/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster #: 1391
P.A. ID: 061-51000-19 Applicant: NEW YORK/ DESIGN AND CONSTRUCTION, DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant
AFTER June 30. 2002. THE ONLY WORK REMAINING WILL BE TIEBACK INSTALLATION, SLURRY WALL REPAIR, THE RESTORATION OF LIBERTY PARK. AND SITE DEMOBILIZATION (TO INCLUDE SOME MISCELLANEOUS SECURITY). ON July 1st OPERATION AND MAINTENANCE OF THE SITE WILL BE TAKEN OVER BY THE PA. BOVIS/AMEC WILL CONTINUE TO COMPLETE THE WORK DESCRIBED AFTER THE PA TAKES OVER THE SITE.
I HE COS iS ASSOCIATED WITH THE OPERATION OF DDC'S TEMPOFtARY FIELD OFFICE SPACE ARE PAID FOR BY BOVIS/AMEC AND Wll I BE INCLUDED IN THE PAYMENT REQUISITIONS. DDC HAS BEEN USING OFFICE SPACE RENT-FREE SINCE THE DISASTER AND WILL CONTINUE TO DO SO THROUGH September 15, 2002. RENTAL COSTS MAY BE INCURRED AFTER THAT DATE FOR THE STAFF WORKING ON CONTRACT CLOSEOUT.
THE CITY OF NEW York HAS NEGOTIATED THE HIRING OF CERTAIN CONSULTING FIRMS TO ADVISE ON SPECIFIC SITE RELATED PROBLEMS AND TO PROVIDE OTHER MISCELLANEOUS SERVICES AS DESCRIBED IN THE ATTACHMENT. THE BOVIS/AMEC CONSULTANTS AND SUBCONTRACTORS AND THEIR SCOPES OF WORK ARE INCLUDED AS AN ATTACHMENT AFTER THE SITE IS TAKEN OVER BY THE PA. THESE CONSULTANTS WILL TRANSITION OFF OF THE PROJECT. TWO CONSULTANTS, SHELDRAKE AND KDF. WILL REMAIN TO ASSIST DDC WITH THE CONTRACT CLOSE-OUT.
ONE CONSULTANT. LIRO. MANAGED THE OVERALL COORDINATION EFFORT FOR UTILITY AND ROADWORK NEIGHBORING THE WORLD TRADE CENTER SITE. THIS WAS NECESSARY IN ORDER TO MINIMIZE THE IMPACT ON THE CONTINUING DEBRIS REMOVAL AND HAULING OPERATIONS. LIRO'S PRIMARY FOCUS WAS TO COORDINATE, MONITOR, AND ENSURE THAT THE UTILITY AND ROADWORK BEING PERFORMED DID NOT IMPEDE THE DEBRIS REMOVAL AND HAULING OPERATIONS, LIRO WAS ORIGINALLY OBTAINED UNDER THE CM AGREEMENT WITH TULLY; HOWEVER, ON MARCH 22. 2002. LIRO'S CONTRACT WAS TRANSFERRED TO BOVIS/AMEC, BECAUSE ALL OTHER SUBCONTRACTORS AND SUBCONSULTANTS WORKING ON THE DEBRIS REMOVAL OPERATIONS HAD ALREADY BEEN CONSOLIDATED UNDER THE BOVIS/AMEC AGREEMENT. LIRO'S SCOPE OF WORK WITH RESPECT TO DEBRIS REMOVAL WAS COMPLETED ON MAY 31, 2002. FUNDING FOR LIRO TO PERFORM THIS WORK BEYOND MAY 31. 2002, IS NOT ELIGIBLE UNDER THIS DEBRIS REMOVAL PW LIRO CONTINUES TO COORDINATE/MANAGE INFRASTRUCTURE WORK; HOWEVER, THAT WORK IS ADDRESSED UNDER SEPARATE PWS FOR THE DEPARTMENT OF TRANSPORTATION OR SANITATION, AS APPROPRIATE.
DDC HAS HIRED EIGHT EMPLOYEES FROM O'BRIEN KREITBERG (OBK) AS TEMPORARY EMPLOYEES THROUGH THE BOVIS/AMEC AGREEMENT THESE EMPLOYEES WERE HIRED TO BACKFILL DDC'S EMPLOYEES WHO ARE WORKING FULL TIME ON THE DEBRIS REMOVAL PROJECT. THESE TEMPORARY EMPLOYEES WILL BE MANAGING ALL ASPECTS OF DESIGN AND CONSTRUCTION PROJECTS INCLUDING NEW BUILDING AND RENOVATION PROJECTS FOR DDC. THE COST OF THE REGULAR TIME AND OVERTIME LABOR OF THESE TEMPORARY EMPLOYEES IS ELIGIBLE FOR FUNDING AS LONG AS THEY CONTINUE TO BACKFILL DDC'S REGULAR FULL TIME EMPLOYEES WHO ARE WORKING ON THE DEBRIS REMOVAL PROJECT. AT THE COMPLETION OF THE DEBRIS REMOVAL PROJECT WHEN DDC'S EMPLOYEES RETURN TO THEIR NORMAL FUNCTIONS. THE COST OF THIS TEMPORARY LABOR WILL NO LONGER BE ELIGIBLE. A LIST OF OBK EMPLOYEES WHO ARE BACKFILLING DDC EMPLOYEES THE NAMES OF THE DDC EMPLOYEES. AND THE EXPECTED DATES THAT THE. DDC EMPLOYEES WILL BE RELEASED FROM THE DEBRIS REMOVAL PROJECT IS ATTACHED
THE CITY REQUIRED A COMPLIANCE MONITOR FOR THE DEBRIS REMOVAL PROJECT, THE NEW York CITY DEPARTMENT OF INVESTIGATION (DOI) HAS ESTABLISHED THE INDEPENDENT PRIVATE SECTOR INSPECTOR GENERAL (IPSIG) PROGRAM FOR MONITORING CONTRACTORS. IN ORDER TO DO BUSINESS IN NEW York CITY. CERTAIN CONTRACTORS ARE ASSIGNED A CONTRACT COMPLIANCE MONITOR THAT IS PAID FOR BY THE CONTRACTOR. DOI IMPLEMENTED THIS PROGRAM FOR THE WTC DEBRIS OPERATION BECAUSE OF THE MAGNITUDE OF THE OPERATION AND THE TIME AND MATERIAL PAYMENT BASIS EACH CM WAS ASSIGNED AN IPSIG COMPLIANCE MONITOR. THE BOVIS MONITOR IS THACHER ASSOCIATES.AND THE AMEC MONITOR IS STIER ANDERSON AND MALONE. SOME FUNCTIONS THAT THE IPSIG COMPLIANCE MONITORS PERFORM
Page 16 of 311
NYC-WTC_000251112
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000266254
FEMA worksheet with project and declaration numbers; general form.
3 shared non-person entities · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
7 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
4 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454737
FEMA project worksheet guidance for disaster-damage projects and cost thresholds.
3 shared non-person entities · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141648
Memorandum instructing staff to submit monthly force account equipment usage reports for FEMA reimbursement.
3 shared non-person entities · 1 shared topics · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100652
Final notice urging building owner to participate in city debris cleanup program for exterior surfaces.
3 shared non-person entities · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150530
Law Department notice instructing staff to preserve original World Trade Center documents for potential litigation.
4 shared non-person entities · 1 shared topics · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150536
Official letter declaring an emergency to facilitate procurement under specific city rules for a WTC-related contract.
4 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
6 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113544
Form recording visual inspection results for facades and air monitoring locations at the specified building site.
3 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153707
DEP correspondence dated March 26, 2003, regarding a Declaration of Emergency for World Trade Center contracts.
4 shared non-person entities · 1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
8 shared non-person entities · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similarity score 0.962 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163682
Correspondence regarding an error correction in updated addendums submitted to the EPA.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135574
Memo summarizing the completion of exterior debris removal from downtown buildings in March 2003.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164936
Corrected contract addendum addressing errors in prior documentation updates.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similar indexed content
NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
Similar indexed content
NYC-WTC_000454737
FEMA project worksheet guidance for disaster-damage projects and cost thresholds.
Similar indexed content
NYC-WTC_000141648
Memorandum instructing staff to submit monthly force account equipment usage reports for FEMA reimbursement.
Similar indexed content
NYC-WTC_000266254
FEMA worksheet with project and declaration numbers; general form.
Similar indexed content