Disaster 1391 project, NY, Mar 2003

Machine-extracted title · confidence 25%

Expense and applicant details for NYC/Design and Construction related to disaster project.

NYC-WTC_000251095–000251127
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY Date- 03'31/2003 Project Completion and Certification Report (P.4) Disaster #-.1391

PA ID' U6 1 -51000-19 Applicant; NtW YORK / DESIGN AND CONSTRUCTION, DEPARTMENT OF PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant jnsp. __________ ____________ _________ FD WFRF AUDITS AND INVESTIGATIONS TO DETERMINE CM'S COMPLIANCE WITH LOCAL, STATE AND FEDERAL CIVIL LAWS RULES REGULATIONS. AS WELL AS THE TERMS OF THE CONTRACT. THIS WORK IS CONSIDERED TO BE PROJECT MANAGEMENT- ' THEREFORE. THE WORK IS ELIGIBLE FOR FUNDING. REVIEW OF THE DOCUMENTATION SUPPORTING EACH OF THE MONITORS' INVOICES IS RESTRICTED IN ORDER TO PRESERVE THE CONFIDENTIALITY AND INTEGRITY OF THE MONITOR. DOCUMENTATION SUBMITTED FOR REVIEW HAS BEEN REDACTED AND IS RESTRICTED FOR VIEWING ONLY AT THE DOI OFFICE. THE REDACTED DATA IS REVIEWED WITH RESPECT TO ELIGIBILITY UNDER THE PUBLIC ASSISTANCE PROGRAM. THACHER ASSOCIATES HAS SUBMITTED TO DATE A TOTAL OF 10 INVOICES. WHICH HAVE BEEN REVIEWED AND DETERMINED TO BE ELIGIBLE FOR REIMBURSEMENT UNDER THE PUBLIC ASSISTANCE PROGRAM. A SUMMARY OF THESE INVOICES IS ATTACHED. ALL BACK-UP data in a redacted FORM. IS AVAILABLE FOR INSPECTION AT THE DOI. IN ORDER TO COMPLETE THE FINANCIAL RECONCILIATION OF THIS PW. ALL REMAINING INVOICES SUBMITTED BY THACHER ASSOCIATES WILL HAVE TO BE REVIEWED BY FEMA. BOVISZAMEC BIO OUT THE CONSTRUCTION OF A PEDESTRIAN WALKWAY ALONG LIBERTY STREET. THIS WORK IS ELIGIBLE FOR FUNDING UNDER FEMA'S PUBLIC ASSISTANCE PROGRAM; HOWEVER. IT IS COVERED UNDER A SEPARATE PW (PW 957) AS IT IS NOT DIRECTLY RELATED TO THE DEBRIS REMOVAL THE COST ESTIMATE OF THE CONSTRUCTION OF THE WALKWAY $1 850 082 WAS DEDUCTED FROM THE TOTAL PHASE 2 COST ESTIMATE COVERED UNDER THIS PW.

BOVIS/AMEC ALSO BID OUT THE REMEDIATION OF MOLD GROWTH IN THE SUBLEVELS OF BUILDING 5. THIS WORK IS ELIGIBLE FOR FUNDING UNDER FEMA'S PUBLIC ASSISTANCE PROGRAM; HOWEVER. IT IS COVERED UNDER A SEPARATE PW (PW 960) AS IT FS NOT DIRECTLY RELATED TO THE DEBRIS REMOVAL. THE COST ESTIMATE OF THE MOLD REMEDIATION $518 800 WAS DEDUCTED FROM THE TOTAL PHASE 2 COST ESTIMATE COVERED UNDER THIS PW.

E, INDS IN THE AMOUNT OF $605,485 RECOVERED FROM THE SALE OF RECYCLED STEEL BETWEEN April 24. 2002, AND June 25, 2002, HAVE BEEN DE ducted FROM THE TOTAL ELIGIBLE COSTS PROVIDED UNDER THIS PW (SEE COPIES OF CHECKS ATTACHED). FUNDS RECOVERED BETWEEN April 12, 2002, AND April 23, 2002 WERE DEDUCTED FROM PW 870 AND FUNDS RECEIVED PRIOR TO April 12 2002 WERE DEDUCTED FROM PW 750 (AMEC PHASE 1 PW). AN ADDITIONAL AMOUNT ($119,000) WAS DEDUCTED FROM THIS PW ' BASED ON AN ESTIMATE FOR SALVAGE OF SCRAP NON-FERROUS METALS PROVIDED BY DDC (ATTACHED). ANY ADDITIONAL REVFNI IE RECEIVED BY DDC AFTER MAY 29, 2002. FOR RECYCLED STEEL OR SCRAP METALS, MUST BE DEDUCTED FROM THE TOTAL AMOUNT PROVIDE BY FEMA. DDC WILL HAVE TO PROVIDE THIS INFORMATION TO FEMA DURING THE FINANCIAL fTECONCILIATION OF THIS PW. "VERSION 1 - THIS VERSION HAS BEEN PREPARED TO INCREASE THE COST ESTIMATE BY $36,750,000 FOR DEBRIS REMOVAL ACTIVITIES PERFORMED BY BOVIS/AMEC AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AND FOR CONTRACT CLOSE-OUT AGTIVIIIES that ARE ON-GOING, THE ESTIMATE IS BASED ON DDC'S RECENT ANALYSIS OF BOVIS/AMEC'S TOTAL ESTIMATED COSTS FURTHER, THE SCOPE OF WORK IS AMENDED AS FOLLOWS:

ON Al Id 1ST 29/1-10, 2002, DDC RELOCATED ITS DEBRIS REMOVAL FIELD OFFICE TO 59 MAIDEN LANE, 22ND FLOOR, COSTS ASSOCIATED WITH THE MOVE AND SET-UP OF THE NEW OFFICE SPACE (INCLUDING FURNITURE, UTILITIES, AND LIMITED BUILD-OUT) ARE ELIGIBLE FOR REIMBURSEMENT, DDC WILL REQUIRE A FIELD OFFICE UNTIL CONTRACT CLOSE-OUT IS COMPLETE, DCAS HAS AN EXISTING LEASE FOR THE SPACE, THE RENTAL COSTS WILL BE FUNDED UNDER A SEPARATE PW FOR DCAS IN EARLY OCTOBER 2002, LZA, A BOVIS/AMEC SUBCONSULTANT, PERFORMED A SUPPLEMENTAL ENGINEERING EVALUATION OF THE STABILITY OF 130 LIBERTY STREET, A PRIVATELY OWNED BUILDING ON THE GROUND ZERO PERIPHERY, DURING PHASE 1 OF THE DEBRIS REMOVAL EFFORT, LZA PERFORMED AN ANALYSIS OF THE STABILITY OF THE BUILDING INCLUDING THE EFFECT OF TYPICAL WIND LOADS, LZA ALSO DESIGNED BRACING THAT WAS INSTALLED TO ALLOW FOR SAFE DEBRIS REMOVAL THE SI IPPI EMENTAL EV Al UATION WAS PERFORMED BECAUSE THE PRIVATE OWNER WAS CONCERNED

Page 17 of 311

NYC-\/VTC_000251113

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000251113Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →