NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Project Worksheet, FEMA 3067-0151

Machine-extracted title · confidence 30%

FEMA project worksheet with burden disclosure for NY disaster work.

NYC-WTC_000302302
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET Expires April 30, 2001

PAPERWORK BURDEN DISCLOSURE NOTICE WI-0/7' Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms. You are not required to respond to this collection of information unless a valid 0MB control number is displayed m the upper right comer of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collections Management, Federal Emergency Management Agency, 500 C Street, SW, Washmgton, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address. DECLARATION NO. PROJECT NO. FIPS-NO. DATE CATEGORY SSI 061-51000-51 April 2, 2002 B FEMA- 1391 -DR- NY D/KMAGED FACILITY WORK COMPLETE AS OF: Inspection of NYCDOT facilities 11/21/01 100% % APPLICANT COUNTY New York City Department of Transportation Manhattan

LOCATION LATITUDE LONGITUDE Various NYCDOT facilities

DAMAGE DESCRIPTION AND DIMENSIONS The fires and explosions at WTC buildings 1 & 2 and their subsequent collapse resulted in the spread of a huge debris and dust cloud, containing unknown material, onto a widespread expanse of Lower Manhattan. Additionally, the fires sparked by the explosions burned for weeks, releasing potentially hazardous particles, fumes, and gases throughout the area. The possible presence of a wide range of contaminants from the debris cloud prompted many NYC governmental agencies to undertake or contract for the inspection of their facilities to determine if they had been contaminated. and if so, to what extent. The NYCDOT contracted for the inspection of their offices at 40 Worth St.. 2 Resctor St., 253 Broadway, one of the Staten Island Ferryboats, and the Battery Maritime Building. Portions of 40 Worth St. and 2 Rector St. were subsequently re-inspected.

■ SCOPE OF WORK I This small Project Worksheet is written to reimburse the NYCDOT for expenses incurred during the inspecbon of its facilities by the Safety I Environmental Company of N.Y., a Staten island firm. The services were provided by Safety Environmental from 9/25/01 to 11/13/01, and included: I Investigators/technicians for the actual sampling and laboratory analysis, lead wipe samples, pcm samples, pIm samples, tern samples, volatile organic ■ compund samples, air particulate samples, and lead air samples. These samples were collected from the NYCDOT facilities noted in the Damage I Descriptions above. I ELIGIBILITY I As per the FEMA Public Assistance Guide, pgs. 47-48, "Generally, those prudent actions taken by a community to .. nnsure the continuation of I essential public services,.. ar ? eligible for assistance." NYCDOT is the lead NYC governmental agency concerned with the transportation of goods and I people within NYC, and the inspections were necessary in order for it to have safely resumed providing these essential services to City residents. Thus, I the expenses incurred for this work are deOmed eligible. I DOCUMENTATION I The applicant provided invoices covering the indicated services. FEMA has inspected them and found them to be reasonable in scope and cost. I ATTACHMENT #1 I Copy of the purchase orders and invoices for the services and material described above.

Does the Scope of Work change the pre-disaster conditions at the site? □ Yes KI No Special Considerations issues included? □ Yes No Hazard Mitigation proposal included? O Yes EI No Is there insurance coverage on this facility? □ Yes No PROJECT COST ' ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST 1 9999 Investigator/technician labor 340/HR $39.00 $13,260.00 2 9999 Lead wipe samples 407 / EA $20.00 $8,140.00 3' 9999 PCM samples 222 / EA $10.00 $2,220.00 4 9999 PLM samples 5/EA $15.00 STYOO" 5 9999 PLM samples (rush) 6/EA $30.00 $180.00 6 9999 Volatile Organic Compound samples "sTea” $150.00 $750.00 7 9999 Air Particulate samples 35/EA $75.00 $2,625.00 9999 TEM air samples 6/EA $65.00 $390.00 ■99^ Lead air samples 36/EA $15.00 $540.00 / I > PREPARED BY: P. Barry TITLE: PAC TOTAL COST

FEMA Farm 90-91, SEP 98 REPLACES ALL PREVIOUS EDITIONS.

CITY_21MC100_004947381

NYC-WTC_000302302

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302302Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000302305

FEMA project worksheet with burden disclosure for NY disaster-1391 activities.

Similar indexed content

NYC-WTC_000302277

Paperwork burden disclosure notice for project documentation in FEMA/NY publications.

Similar indexed content

Compare copies and versions →