NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

implementation. 10/30/00: Reconstruction 80% complete. 11/28/00: Reconstruction 95% complete. Tentative bridge opening to traffic scheduled for 12/15/00. 12/19/00: Bridge opei to traffic. 1/31/01: Bridge open to traffic. Site restoration work remains. 2/20/01; Rt. 10 Br site restoration work remains. Rt. 268 Bridge to begin construction on or about 3/1/01. A revised staging and access proposal for the Route 268 Bridge was received from Cianbro on 3/5/01. Copies of the revised materials were forwarded to Office of Water Supply Lands anc Operations personnel on 3/15/01. 3/28/01: Rt. 10 Bridge site restoration work remains. Rt.: Bridge began construction on or about 3/26/01. Rt. 268 bridge will be closed to traffic on Monday, 4/2/01. 4/24/01: Rt. 10 Bridge site restoration work remains. Rt, 268 Bridge begai construction on 3/26/01. Rt. 268 bridge closed to traffic on Monday, 4/2/01. Paint removal/demolition in progress. 5/22/01: Rt. 10 Bridge site restoration work underway. Rt. bridge demolition in progress. 6/20/01; Rt. 10 Bridge site restoration work underway. Rt. 2i bridge demolition approximately 35% complete. 7/27/01: Demolition near completion. Reconstruction underway. Project is approximately 50% complete. 8/29/01; Demolition complete. Reconstruction underway. Project is approximately 60% complete.

Town: Tompkins Drainage Basin: Cannonsville Reservoir Project Name: Padmasambhava Buddhist Center, (Log #5286) Project Description: Proposed SSTS for proposed Buddhist Center for 150 worshipers. Status; No overnight accommodations nor food services will be available. DEP received the prelimii engineer’s report in 8/97 and discussed the proposal with the engineer on 8/18/97. DEP recei the application for SSTS on 9/9/97; issued NIC A on 9/29/97 to the application and prelimina design comments to the engineer on 9/30/97. DEP issued a NOCA on 11/20/97; completed tl review and issued Letter of Approval on 1 y2^/91. DEP met with engineer at the site in 6/98 discuss the new proposal; engineer conducted preliminary deep hole tests; new proposal is fo additional food service and dormitory; applicant advised DEP that the previously approved SSTS will not be constructed. Engineer conducted 24 percolation tests on 7/14/98. DEP recei revised plans for new proposal on 8/21/98; review comments discussed on the telephone on 8/25/98. On 11/5/98 DEP received an Application for Review and Approval of SSTS. NICA was issued on 12/2/98. On 12/29/98 DEP contacted the consulting engineer regarding the application to be completed. On 1/5/99 DEP, issued a letter of NOCA, and sent a letter of review comments on 1/12/99. DEP issued a letter of Request for Extension of Review and Approval Time on 2/16/99. On 2/22/99 DEP received a copy of the SPDES Permit from DEi DEP received a set of a revised plan on 2/23/99 for review. On 3/16/99 DEP sent a letter of plan review comments. On 3/24/99 DEP received the revised plan for approval. DEP is awaiting review comments from the NYSDOH. On 4/12/99 the design engineer confirmed th the “dormitory” will remain as proposed instead of a “condominium” or “apartment” building On 4/19/99 DEP received a copy of review comments from the NYSDOH. DEP approved th plans on 4/13/99 and issued a Letter of Design Approval. On 6/19/99 the Design Engineer called for DEP’s opinion regarding the construction road construction at downhill side of the absorption field. DEP advised the Engineer that a minimum of 20 foot separation should be provided to avoid seepage interference due to shallow fragipan layer. If practical provide 301 35 ft. Engineer has agreed. Construction inspection. 7/13/99 status: construction 10% complete. 8/24/99 status; construction 15% complete. The consultant called on 9/30/99 to no DEP of fill material percolation tests at the quarry. The construction is in progress of filling t granular soil for the absorption field. The engineer is constantly informing DEP of the construction activities. On 11/16/99 DEP met with the consulting engineer and the owner’s representative at the project site to discuss compaction and percolation of the fill system for tl

45 NYC-WTC_000291071

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291071Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 91

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.934 (not a probability)

machine-extracted · confidence unavailable · Check page ↗
Permit application, Education Dept. · page 146

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.929 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →