NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

D EP A RTMENT OF EN V IRO N M E N TAL Protection stage II will provide additional delivery capacity to the West Side of Manhattan and sections of Queens, Brooklyn and Staten Island. More importantly. Stages 1 and II will provide bypass capability to either City Tunnel No. 1 or No. 2, which is essential to maintain the entire water supply system and avoid potential problems. Stage II will consist of two sections, or legs, to be constructed separately at a total cost of $1.5 billion. The Manhattan leg will start at a previously constructed shaft in Central Park, run south along the East Side to the City Hall area and then north along the West Side, terminating in the vicinity of West 60"^ Street and Amsterdam Avenue. Bids for part of the Manhattan leg were opened in August 2001 and the contract was awarded in December 2001. Completion of this portion Is scheduled for Calendar 2010. The Brooklyn/Queens leg of Stage 11 extends from Western Queens and continues south to Red Hook, Brooklyn where it connects with the previously constructed Richmond Tunnel, serving Staten Island. The Brooklyn/Queens leg has been excavated, lined and will begin delivering water in Calendar 2004. There are currently three contracts to install equipment for the Brooklyn/Queens shafts.

Water and Sewer Operations • During the first four months of Fiscal 2002 the Department’s leak-detection crews surveyed 8.9 million linear feet of water main, compared with 7.4 million linear feet during the same period of Fiscal 2001. As a result, 10 potential water main breaks and 77 leaks were detected, saving 3.6 million gallons of water per day during the first four months of Fiscal 2002. DEP leak detection crews discovered 22 water main breaks during the first four months of Fiscal 2002, compared to 16 breaks during the same period of Fiscal2001.

• The Department received 3,600 catch basin complaints during the first four months of Fiscal 2002 and resolved 97.2 percent of the complaints within 30 days. In comparison, it received 4,018 complaints during the first four months of Fiscal 2001, resolving 94.5 percent within 30 days.

• During the first four months of Fiscal 2002 DEP cleaned 17,076 catch basins, compared with 12,695 catch basins during the same period of Fiscal 2001.

Landfill Remediation • The Department is remediating three former Department of Sanitation landfills, located at Pennsylvania Avenue and Fountain Avenue in Brooklyn and Brookfield Avenue in Staten Island.

Construction of the Pennsylvania Avenue Landfill pier was completed in February 2001. The pier will be the off-loading point for barges transporting cover material to the landfill. DEP began construction of a leachate collection and treatment system in early Calendar 2001; work is expected to be completed in late Spring 2002. The leachate will be collected along Fresh Creek Basin, treated on site and pumped directly to the 26’^ Ward Sewage Treatment Plant. DEP also awarded a contract for capping and closing the landfill in November 2001 and expects work to begin in March 2002.

Construction of the Fountain Avenue Pier began in October 2001 and is expected to be completed by October 2002. DEP awarded a contract for capping and closing the landfill in June 2001 and expects work to begin in April 2002.

The New York State Department of Environmental Conservation (DEC) has not yet issued a Final Remedial Action Plan for the Brookfield Avenue Landfill. DEC expects to issue a Record of Decision by April 2002. When the final action plan is issued, the project will move into the Remedial Design Phase.

93

CITY_21MC100_013395167

NYC-WTC_000245554

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245554Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →