NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document r ■ L- ■■ -

Department yOf Environmental Protection Environmental Review II • Acting as the lead agency, the Department initiated 21 new and completed 20 pending environmental reviews in accordance with City Environmental Quality Review procedures during the first four months of i Fiscal 2002, compared with eight reviews initiated and 12 reviews completed during the same period of Fiscal2001.

During the first four months of Fiscal 2002 DEP received 17 requests for technical assistance and completed 14 requests for technical assistance for which it did not act as lead agency. In the first four months of Fiscal 2001 the Department received 10 requests for technical assistance and completed 17 requests for technical assistance.

• The Department plans to continue environmental assessment work for water quality improvement projects in Fiscal 2002. These projects include the combined sewer overflow abatement program and nitrogen management programs and upgrades to the Hunts Point, Wards Island and the 26'" Ward Water Pollution Control Plants. DEP will also perform additional environmental reviews for siting the Croton Water Filtration Plant. i •|Si 1! i

'l Wastewater Treatment • DEP owns and operates 14 sewage treatment plants within the City. All but one, the Newtown Creek Plant in Brooklyn, have been upgraded or built to provide full secondary treatment of sewage in accordance with the applicable State and federal regulations. An interim upgrade is underway at Newtown Creek to keep the plant operating efficiently while the long-term plan to achieve full secondary treatment is developed. Upon completion of the final upgrade, the Newtown Creek Plant will provide full secondary treatment in order to improve water quality.

• The following plants are either in the design or construction phase of capital projects: North River and Wards Island in Manhattan; Tailman Island, Jamaica and Bowery Bay in Queens; Hunts Point in the Bronx; and Coney Island, Owls Head and 26'" Ward in Brooklyn. The upgrade of these facilities will include equipment replacement, odor control and the installation of additional controls to improve performance and reliability. Additionally, the nitrogen capability at the four Upper East River plants (Wards Island, Tailman Island, Bowery Bay and Hunts Point) and the 26"' Ward plant in Jamaica Bay will be improved. North River, Coney Island and Owls Head are in the final phases of being upgraded and the remaining plants are in various design and construction phases. In Calendar 2001 DEP began the facility planning stage for the Staten Island plants of Port Richmond and Oakwood Beach, the Rockaway treatment plant in Queens and the North River plant in Manhattan.

• To reduce the nitrogen loadings in Long Island Sound, DEP will bid a two-year contract by the end of Fiscal 2002 to haul centrate, a sludge residual, between wastewater treatment plants. This contract, made necessary by the nitrogen discharge levels from dewatering facilities located on the Lipper East River and Jamaica Bay, will allow centrate to be removed to treatment plants on receiving waters with a lower nitrogen content than other areas. The contract will ensure that all plants will meet the State Pollutant Discharge System permit limits for nitrogen.

• During the reporting period DEP continued the program to control combined sewer overflows (CSC). CSOs are formed when the rainwater drained from the street combines with the sanitary drainage from homes and businesses that is carried in the same system of pipes. During heavy rainfalls, part of this combined flow is directed to City treatment plants, and the remainder is discharged into the surrounding j waters as CSOs. The City has gradually increased its capture of the mixture of rainwater and sanitary [ sewage that flows through the combined sewer system during wet weather. In 1987 the City captured j and treated only 18 percent of the wet weather flow. Currently the City captures and treats 55 percent of the wet weather flow. j

94

CITY_21MC100_013395168 NYC-WTC_000245555

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245555Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →