NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

II. DEP Organization and Responsibilities The review of development activities within the New York City (NYC) watersheds and the ongoing inspection of projects under construction or operating are the responsibility of the Division of Operations and Engineering within the Bureau of Water Supply. The Division of Operations and Engineering has several field offices located in each of three watershed regions.

The Engineering Section is basically divided into three units: Regulatory Compliance and Inspection, Project Management and Project Review.

The Regulatory Compliance and Inspection unit monitors the performance of all wastewater treatment plants (WWTP) and other point source discharges within the watershed on a regular basis. To ensure that these facilities are operated and maintained at levels necessary to meet the limits and conditions of their SPDES permits, staff has implemented a comprehensive regulatory and technical support program to,oversee these State Pollutant Discharge Elimination System (SPDES) permitted sites. Data gathered from regular inspections is compared with the facilities’ Discharge Monitoring Reports (DMR)s for an analysis of compliance. Reports are forwarded to the facility owners/operators as well as New York State Department of Environmental Conservation (DEC) and local health departments where necessary. Meetings with the oivners/operators are held after the inspection reports are received to discuss any compliance or Operation and Maintenance (O&M) issues. These reports may also serve to document non- compliance if legal action is necessary. The activities of the Regulatory Compliance and Inspection unit are detailed in the 312e and 501b Section of the Filtration Avoidance Determination deliverable.

The Project Management unit performs a broad range of regulatory support and filtration avoidance tasks, and was initially established to assume responsibility for preparing, implementing, tracking and reporting mandated construction and outreach activities stemming fi'om the Kensico Basin Water (Quality Control Program. The unit now develops regulatory and non-regulatory programs applicable throughout the entire watershed, to include policy and technical aspects of the Bureau’s regulatory and watershed initiatives. The unit has prepared regulatory guides, administered programs such as the Phosphorus Offset Pilot Program, and has provided technical support for the TMDL, Wetland and Non-point Programs. The group also reviews significant development applications, and develops and manages contracts necessary to meet the MOA and Filtration Avoidance mandates and Department goals. The activities of the Project Management unit in relation to Non-Point Source initiatives within the watershed are detailed in the 308i Section of the Filtration Avoidance Determination deliverable.

The Project Review unit has traditionally reviewed the technical and regulatory aspects of all residential, commercial and industrial developments that propose the construction or alteration of sewage treatment systems to access potential impacts on water quality within the NYC watershed. With the promulgation of the new Rules and Regulations for the Protection From Contamination, Degradation and Pollution of the New York City Water Supply and Its Sources (WR&R), the role of the Project Review unit has been expanded to include stormwater reviews, non-point source and wetland protection, as well as the review of applications pending before the State and Federal agencies. These include activities such as stream crossing and wetland permits, mining operations and timber harvests. Comments are provided to other governmental agencies regarding potential water quality impacts and mitigation strategies. In addition to the

2

NYC-WTC_000291029

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291029Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 92

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.943 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →