NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Town; Kortright Drainage Basin; Cannonsville Reservoir Project Name: DOT Route 10 - Hobart/ Bloomville Phase 2, (Log #5566; see 5099 for Phase 1) Project Description: Phase 2 - Reconstruct/ resurface and realign section of NYS Route 10 between hamlet of Bloomville and Village of Hobart Status: DEP reviewed the preliminary plans dated January 1998; conducted site visit on 3/18/98. DEP has reviewed the 3/23/99 correspondence from DOT regarding a project proposal that involves the resurfacing and realignment of various section of NYS Route 10, as well as replacement of two bridges along Route 10 between the Villages of Hobart and Bloomville. This 3/23/99 is in response to DEP’s 4/3/98 letter to DOT which detailed DEP’s concerns and recommendations for the protection of water quality. A second site evaluation occurred on 4/29/99. DEP conducted a site inspection of this proposed road reconstruction, bridge replacement, and wetland creation project on 11/18/99. Bridges to be replaced - BIN 1007810 (Betty Brook) and BIN 1007830 (McMurdy Brook). Also inspected ongoing work on NYS Route 10 west of Bloomville. Significant cut and fill and wetland disturbance will result from this proposed work. DEP will contact DOT in December for additional information on created wetland designs. An on-site meeting with DOT and USACOE may be held at a later date. DEP contacted DOT by telephone on 12/16/99 to discuss aspects of the wetland creation designs, and to propose an on-site meeting and inspection. DEP will contact ACOE and DOT personnel in January to schedule this meeting. Village of Hobart stormwater retrofits will also be discussed. Review ongoing. On 4/23/01, DEP forwarded information on storm inlet enhancements for sediment control and organic media filters for use in urban impervious settings to DOT. On 6/4/01, DEP received the Plans and Specifications for the NYS Route 10 reconstruction in the Towns of Stamford and Harpersfield (Phase 3). On 7/12/01, DEP issued a letter to DOT with specific comments on the submitted plans and documentation. The letter addressed the proposed installation of deep sumps as part of the Village of Hobart stormwater retrofit project. Also addressed were erosion and sediment control and stream protection issues, including the need to re-establish a stable channel configuration (floodplain bench and thalweg/deep channel area) at the stream crossings. SEQRA - Type II - Replacement in kind.

Town: Middletown Drainage Basin: Pepacton Reservoir Project Name; Hamil, Jerry (The Water Guy), (Log #11674) Project Description; Proposal to construct a 24' x 26' garage Status: DEP conducted a Pre-application conference on 4/5/01 for this proposal to construct a garage building on an existing small business/residential property. During the site inspection, it was determined that a Minor Permit would apply to this project, as the total new impervious surface will not exceed 1000 square feet. On 4/25/01, DEP received the SPPP application, short EAF and location map. A NOCA was issued on 5/15/01 and the Design Approval letter was issued on 5/17/01. Stormwater Management Practices include silt fence between excavation and watercourse, and subsurface infiltration system for roof runoff. Construction is slated to start i the beginning of June. Construction of the building has started, with the stormwater infiltratioi to commence the last week in June. The subsurface infiltration system has been installed properly. Applicant has also submitted an application for the replacement of a culvert which will be commenced once the flow has ceased. A letter of Construction Acceptance was issued < 9/18/01. A contract in the amount of $1,991.99 has been sent to the applicant for signature, an was received back on 9/24/01. SEQRA - Type II, less than 4,000 square feet.

34 NYC-WTC_000291060

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291060Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 137

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.935 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →