NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Department of Design and Construction In conjunction with the Department of Transportation (DOT) and the Department of Environmental Protection (DEP), DDC performed a television inspection of approximately 28,500 linear feet of sewer lines within the vicinity of Ground Zero to determine the integrity of the system. The three agencies are jointly preparing a complete scope of work for infrastructure repair and replacement of damaged sewers and water mains and the surrounding streets.

• Demolition of the World Trade Center buildings was completed in late December 2001, leveling the entire site at street level; the remaining work involving below-grade excavation and debris removal is underway.

• The Department worked with two of the construction firms to develop a consolidated plan for site management under DDC supervision. Under the plan, these firms created a single association to provide construction management services for the remaining work, with DDC supervising.

• As of February 2002, over 1.2 million of the estimated 1.5 million tons of debris on the site have been removed. The debris removal and site cleanup effort is scheduled for completion by June 2002.

Infrastructure Division • In the first four months of Fiscal 2002 DDC completed the design of 26 infrastructure projects, compared to 25 projects during the same period in Fiscal 2001.

• The reconfiguration of Columbus Circle is a joint initiative with the departments of City Planning (DCP), Transportation, Parks and Recreation (DPR), and Environmental Protection for the permanent redesign of Columbus Circle and its monument area. In June 2001 the Columbus Circle Advisory Panel reconvened to review current plans and assist in developing a world-class design for Columbus Circle. As a result of that review, the landscape design is being modified and scheduled for completion in Spring 2002.

• During Fiscal 2001 the Department began a project to address ongoing flooding problems in Flushing, Queens. By June 2001, DDC completed the installation of 19 seepage basins. In August 2001 DDC, in conjunction with DEP, began design of a new combined sewer project for this area to divert flow from the existing combined system. The project includes the replacement of old unlined iron water mains and the installation of a combined sewer on 160**’ Street and 29**’ Avenue, and the surrounding area. Design is scheduled for completion in Spring 2002.

• In October 2001 DDC completed the design for installation of new storm sewers in Haughwout Avenue in the Port Richmond section of Staten Island. This project, valued at $2.7 million, includes the upgrade of existing sanitary sewers and water mains.

• In March 2001 DDC completed the design for widening and reconstructing Weed Avenue in the Qakwood Beach section of Staten Island. This project, valued at $4.8 million, will provide much needed storm sewers; an upgrade to existing sanitary sewers and water mains; and new roadway, sidewalks, curbs, traffic lights and pavement markings. Construction began in January 2002; completion is planned for Spring 2003.

• Design was completed in February 2001 on two projects to install lateral sewers to the north and south of Conduit Avenue in Queens, which will connect neighborhoods to the new, substantially expanded Springfield Boulevard storm water removal system and further relieve flooding conditions in these neighborhoods. Construction began in January 2001. Sewer construction north of Conduit Avenue was completed in Fall 2001; the remaining work in the area, including street restoration, was completed in January 2002. The work south of Conduit Avenue has been delayed due to utility interferences and is scheduled for completion in Summer 2002.

141

CITY_21MC100_013395213

NYC-WTC_000245600

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245600Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →