NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Depart ME NT OF De SIG n a nd Co n s t r u c t i o n

• In the first four months of Fiscal 2002 DDC started 30 new infrastructure construction projects, compared to 43 during the same period in Fiscal 2001.

• In February 2001 DDC completed the design for the installation of new sanitary and storm sewers in the Arbutus Avenue area of the south shore of Staten Island. This project, valued at $19.8 million, includes installation of retention basins, sediment control devices and environmental landscaping with special plants that absorb and filter water as it passes through the soil. Construction began in July 2001 and is scheduled for completion in September 2003.

• In the first four months of Fiscal 2002 the Department continued construction on two projects for Jamaica, Queens to incorporate the former Jamaica Water Supply system into the City’s system.

The first project, which began construction in December 2000, includes the installation of new water mains and the replacement of old undersized, unlined mains. The project, involving 52 locations, is scheduled for completion in June 2002.

The second project, which began construction in September 2000, replaced 782 obsolete hydrants with new ones that can be locked in the summer; it was completed in February 2002.

• Reconstruction of sewers in the area bounded by Westchester Avenue, Bruckner Boulevard and Middletown Road in the Bronx, valued at $17 million, began in September 2000; completion is expected by October 2002.

• In March 2001 DDC completed design for street reconstruction in the Crescent Street area of the Cypress Hills and Highland Park sections of Brooklyn. Construction for this project, valued at $18 million, which includes sewer and water main installation, began in November 2001.

• In March 2001 DDC completed design for street reconstruction in the Bergen Avenue area of East Flatbush, Brooklyn. Construction for this $27.7 million project, which includes sewer and water main installation, began in November 2001.

• In September 2001 DDC began construction on the installation of 50,000 linear feet of distribution water mains throughout Brooklyn. This project, valued at $9.2 million, is scheduled for completion In March2003.

• The Department began a $5.2 million project to improve pedestrian safety along Queens Boulevard, from Rego Park through Forest Hills to Kew Gardens. The project includes the installation of pedestrian fencing to deter jaywalking, traffic signals, new crosswalks and improved pedestrian malls, from Eliot Avenue in Rego Park to Union Turnpike in Kew Gardens. Phase I, covering the area between 67’^ Road and 70*” Road in Rego Park and Forest Hills, began in September 2wS and was completed in March 2001. Design for the second phase, covering the areas from Eliot Avenue to 67* Road, and 70* Road to Union Turnpike, was completed in July 200l; fence installation was completed in Fall 2001. Parking meters were installed by DOT along the median side of the service roads.

• In April 2001 DDC began a project to reconstruct the Avenue of the Americas frorh 56* to 59* streets in Manhattan. The project, totaling $10.4 million, includes filling subsurface gaps, the installation of new reinforced concrete pavement, granite curbs, concrete sidewalks, new traffic signs, traffic signals and street lighting. To date, most work on the project has been substantially completed, except for the intersection at 57* Street and Avenue of the Americas and the two easternmost lanes between 58* and 59* streets. Due to traffic considerations, the remaining work can only be performed on weekends and will be completed by June 2002.

142

CITY_21MC100_013395214

NYC-WTC_000245601

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245601Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →