NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 249 pages

NYC-WTC_000195490

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000195490–000195738
Page image
Scanned page image, NYC-WTC_000195686
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

r

This effort will replace chronically failing six-inch water mains in Brooklyn and Queens (Manhattan and the Sl Bronx are largely completed and six-inch replacements in Staten Island are outside the years of this Plan) and

I will include $50.0 million for trunk main extension in the former Jamaica Water Supply Company service area in Queens. ; H

The Ten-Year Plan provides an overall total of $584.6 million for projects in the upstate watershed, of which $515.4 million is scheduled for the first four years. DEP plans to commit $204.8 million for the reconstruction of various City-owned dams. The City will spend $87.7 million in the Ten-Year Plan to acquire environmentally sensitive land in the watershed region. In total, the City will spend approximately $260 million to selectively t acquire land, either through outright purchase or through conservation easements, within the watershed that contains streams, wetlands, floodplains and other areas that are critical to maintaining high water quality. In total, the City has acquired or entered into option agreements to acquire over 30,000 acres in the watershed.

Sewers / DEP operates and maintains over 6,400 miles of sanitary, storm and combined sewers. Approximately 70 Hill percent of the existing system is composed of combined sewers that carry both storm and wastewater to the City’s 14 wastewater treatment plants for treatment. The sewage collection system, which is divided into 14 drainage iif areks, also includes 131,243 catch basins and approximately 5,000 seepage basins to prevent flooding and sewer backups. / ( ’li! For the Sewer program, the Ten-Year Capital Plan allocates a total of $1.2 billion for the replacement, construction and expansion of approximately 602 miles of the City’s sewer system to improve the collection and transport of storm and wastewater. The Ten-Year Capital Strategy provide.s $40.4 million for the programmatic replacement and reconstruction of deteriorating sewers Citywide. $46.7 million is scheduled for the replacement and augmentation of sewers to enhance capacity where required by population increases and economic developinent projects. As required by the State’s Clean Water Act, $9.0 million is provided in 2003 for the construction df separate storm and sanitary sewers and the abatement of combined sewer overflows in the Coney Island drainage area. $522.3 million is allocated for the replacement of sewers experiencing chronic malfunctions that may cause flooding or potential health hazards. The System will be extended into new areas that arc currently underserved, primarily in Queens and Staten Island, for $553.3 million.

During the Four-Year Capital Plan, approximately 329 miles of sewers will be replaced at a cost of $652.8 million. Major projects include the installation of new sewers in the Springfield Gardens / Rockaway Boulevard i area of Queens at a cost of $53.2 million and the installation of new sewers in Vernon Avenue, Staten Island at a /'Cost of $11.61 million. I I ■ i

III 2002, the plan forecasts $247.1 million in spending for the replacement and construction of approximately 112 miles of sewers, including $18.0 million for sewers in Rockaway Boulevard, Queens and $9.4 million for sewers in Chester Avenue in Staten Island.

Whs/ewarer Treatment I DEP’s Bureau of Wastewater Treatment operates 14 wastewater treatment plants (WTPs), one storm-overflow retention facility, 89 wastewater pumping stations, nine laboratories, eight sludge dewatering facilities and three inner-harbor sludge transport vessels. On average each day, these facilities treat approximately 1.3 billion gallons of dry-weather sewage and handle approximately 1,200 wet-tons of sludge. The Ten-Year Plan for Wastewater Treatment projects is $4.3 billion', including $250.0 million of State funds. The Four-Year Plan forecasts $3.5 billion in funding for Wastewater Treatment projects including $100 million in State funds.

I 190

NYC-WTC_000195686

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000195686Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000136542

Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.

Similar indexed content

NYC-WTC_000136670

Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.

Similar indexed content

NYC-WTC_000136990

Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.

Similar indexed content

NYC-WTC_000137113

Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0124.

Similar indexed content

Compare copies and versions →