Riverside South Park - Follow-up
In my last report, I advised that improper sanitary connections at the Riverside Park South
development had been uncovered. This discovery was incidental to an investigation of sewage and
oil leaks in the area.
We determined that a 6" waste stack serving an entire unit of 34 apartments had been mistakenly
connected to a storm sewer rather than a sanitary sewer, and that the waste was flowing to an outfall
at 72nd Street and the river. As noted previously, two Commissioner's Orders were served on the
building management, Trump New World Project Mgmt. Ltd., directing immediate remedy. DEP
staff reinspected the waste lines to determine that the illegal connections had been corrected. Several
days later, a dye test was conducted, confirming that the connections conformed to code. Per
procedure, we are closing out the NYSDEC file number, based upon our confirmation that the proper
connections have been made. It is our understanding that NYSDEC has also completed the
investigation of the earlier oil contamination complaints.
Croton Aqueduct/Jerome Reservoir
The filling of the north basin of the Jerome Reservoir was completed during the evening of
November 26, 2000. The basin was then isolated and left in standby mode, in case it was needed
during the Delaware Aqueduct shutdown. A flow of 10 million gallons of water a day from the
Croton Aqueduct was diverted to the Central Park Reservoir on November 27, 2000 at 11:00 p.m.
The flow was established to keep the water in the Aqueduct fresh and ready for use in the event of
an emergency. The blow-off at Shaft 25 was shut at approximately the same time. A portion of the
Manhattan Water Distribution System was reconfigured to isolate a 48-inch main from the rest of
the system. This main is acting as a conduit allowing water to be flushed from the Croton Aqueduct,
at Shaft 33, to the Central Park Reservoir. This allows water to be kept fresh in the southern leg of
the Croton Aqueduct during the Delaware Aqueduct shutdown. Flow monitoring is being performed
on a daily basis.
Springfield Gardens Industrial Park (Air Freight Area) (a/k/a SE-727); Queens
Springfield Gardens Residential Areas (a/k/a SE-727A and SE-727B); Queens
The Springfield Gardens Task Force team of DEP, the NYC Department of Design and
Construction(DDC) and NYC Economic Development Corporation (EDC) met with Queens
Borough President Shulman on Wednesday, December 6, 2000 to provide a status report on the
proposed capital projects in the Air Freight and Residential Areas. The Task Force reported that
construction of the Phase I project will commence in April, 2001. The Phase II project will begin
the design and street acquisition process shortly with construction to be scheduled for FY-2003.
Gateway Estates - Retail and Residential Development, Brooklyn
DEP Engineers are currently reviewing a Private Sewer Plan (PDK-20/00), which was submitted by
the consultants for the Gateway Estates owners. This private sewer plan is for the construction of
storm sewers and outfalls to a proposed freshwater wetlands area adjacent to Shore Parkway. These
sewers are being constructed for the new Gateway Center Mall project, this is the first phase of the
Gateway Estates plan. The private sewer plans, along with the mitigation plans for the wetlands area,
-6-
NYC-WTC 000137941