Radiation and Pollution Prevention CAC Meeting
Updating the radiation incident described in previous reports, the FBI has reviewed all
the evidence
available and determined that there is not any indication of criminal intent in the
disposal of
radioactive substances found at the Newtown Creek WPCP. There will be no criminal
investigation.
However, the case has been referred to the US Attorney Civil Division for review
possibly leading
to a civil environmental investigation. On March 21", members of my staff attended
a meeting of
the City-Wide Pollution Prevention CAC at 125 Worth Street. One of the agenda
items related to
the radiation issue. Certain concerns had been previously expressed by CAC members.
We reported
on the radiation incident, responded to questions, and allayed the concerns of the
attendees as to the
public safety issue. After the CAC requested that there be follow up discussions of
the possible
impact of radiation on biosolids, we advised that we were tracking the Joint
National Survey
currently underway by USEPA and the Nuclear Regulatory Commission on that
specific issue. The
discussion of biosolids tied in with another presentation made at the meeting.
NYCDOT described its program of landscaping of natural areas along major highways
and at exits
and entrances of major arteries, through the land application of City biosolids. NYCDOT
expressed
satisfaction with its use of biosolids product, and recommended that biosolids
application be
extended to other uses within the City.
Settlement of Fill Material - 84th Avenue between 159th and 160th Streets; Queens
Settlement of the fill material used in the vicinity of 84th Avenue and 159th Street
has caused the
foundations of some area homes to settle or shift and resulted in significant structural
damage to
several homes. On January 23, 2001 the settlement of the unstable soil caused the 8
inch water main
in that intersection to fail. A section of the 8 inch water main was
replaced and the main was put
back in service later that day. The sewers in the area were inspected and
found functioning properly
and the water mains were surveyed and no other leaks were found. As a
precaution the storm and
sanitary sewers in 159th Street between the Grand Central Parkway Service
Road and 84th Avenue
(one block) were lined. In order to eliminate the potential of a failure in the
existing cast iron water
main in 84th Avenue, the main will be replaced with a more durable
ductile iron main. The
Department of Design and Construction is developing procedures to be used
when the main is
replaced that will minimize the impact on structures in the area affected by the
unstable soil. The
main will be replaced by DEP personnel.
Reservoir Operations; Hillview Reservoir
The South Connecting Conduit, which had been shut down since February 21,
2001 for inspection,
was put back into service Wednesday, March 14, 2001. The Catskill
Aqueduct was shut down
Friday and Saturday nights, March 23 and 24, 2001between 10 p.m. and
6 a.m. to allow the
contractor's diver to take measurements in the Uptake 1 shaft. The contractor,
NAB Construction
will be installing a new caustic injection ring in the shaft. A number of
additional dives are planned
in the upcoming weeks.
Pumping Operations; Mosholu Pump Station
Con Edison had scheduled a shutdown of the Mosholu Pump Station
for Thursday, March 23, 2001
to work on their equipment. The shutdown was canceled at the last minute
because of the inclement
weather. It will be rescheduled for sometime in the near future.