REMOVAL OF LAKE OVERFLOWS
A limited water management investigation was begun under the Lake Overflow
Investigations Task (14) of the Wards Island SSES. This investigation included both
Central Park and Van Cortland Park. Overflows from these lakes were measured,
and alternatives to remove these overflows from the Wards Island combined sewer
system were developed and evaluated. However, it was determined that further,
more detailed analyses would need to be performed in order to reach a final
recommendation.
A twenty-four month Engineer Services Contract has been awarded to Malcolm
Pimie, Inc. to expand upon these preliminary investigations. All major
waterbodies within Central Park (the Reservoir, the Pool, Harlem Meer, the
Lake, Belvedere Lake, Conservatory Pond and the Pond), and Van Cortlandt
Park (Van Cortlandt Lake and the 4 Henry Hudson lagoons) will be studied.
Drainage areas of each individual water body will be delineated, stormwater
outfalls discharging into these waterbodies will be identified, non-point runoff
sources will be investigated and City water inputs will be determined. In
addition, flow from existing wells and groundwater sources will be identified
and quantified. A Water Quality model will be developed in order to predict
water quality conditions and assist in the selection of the most favorable
alternative for the diversion of flow from the Wards Island combined sewer
system. In consultation with the Department of parks and Recreation
(NYCDPR) and the Central Park Conservancy (CPC) for Central Park, a plan
will be selected and an environmental assessment and conceptual design of that
plan will be undertaken for each park.
UPDATE AS OF DECEMBER 31, 2001:
While a recommended plan for Van Cortlandt Park has been agreed upon in
concept, further work has been deferred until such time as the new City
administration can be apprised of the status of this project. NYCDPR is unable
to participate in funding the Van Cortlandt Park project at this time, and
although NYCDEP is prepared to move forward with components of the plan to
reroute stormwater out of the collection system and to the Harlem River,
NYCDPR is withholding their consent to let DEP do work in the Park until
issues regarding the rest of the plan are resolved. The Central Park
Conservancy, the organization that is responsible for the management of Central
Park, has not approved the Central Park plan. Similar to the Van Cortlandt
Park plan, the Central Park plan will need to be reviewed by the new
administration prior to making decisions on implementation.