DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Town: Middletown Drainage Basin: Pepacton Reservoir Project Name: Middletown New Town Offices (Log #H632-SP) Project Description: The plan addresses increases in runoff and pollutant loading resulting from paving of an exis gravel parking area located within 100 feet of the East Branch Delaware River. Status: DEP attended a site inspection and on-site meeting with representatives from the Town and t Engineering firm to discuss SPPP requirements and related issues for this proposed building conversion. During the site inspection, it was determined that a SPPP would be required for project. Relocation of the highway garage was partly funded by the Environmental Benefits Program, and conversion of the old building is intended to reduce the pollution potential adjacent to the East Branch Delaware River. On 11/2/00, DEP issued a letter to the engineei stating that a SPPP will be required for the proposed paving of an existing gravel parking lot located within 100 feet of the East Branch Delaware River, and addressing sewage disposal, petroleum storage, and control of stormwater runoff from existing paved impervious surfaces DEP received a copy of a letter from the engineer to CWC dated 12/8/00 which summarized SPPP requirements for the proposed project and outlined the preliminary costs of the stormw management system and SPPP preparation. DEP also received a letter from DEC dated 12/18/00 stating that the existing 2000 gallon fuel storage tank located at the back of the gara building requires registration and secondary containment or an overfill prevention device as required by Part 613 of the Petroleum Bulk Storage regulations. In addition, the two existing temporary aboveground gasoline and diesel tanks must be registered. DEC also recommend that the 2000 gallon tank be replaced with smaller indoor tanks. On 1/24/01, DEP received a copy of a letter issued to DEC by the Town of Middletown addressing the 2000 gallon fuel storage tank located at the rear of the old highway garage building. The letter stated that the tank was empty and currently not in use. However, the tank may be surrounded by a pre-cas concrete impoundment and re-filled to serve the proposed town office building. Alternately, the tank is found to be unsound, it will be removed and replaced with two 275-gallon tanks tc placed in the basement of the building. DEP received the SPPP for the New Town Office Building renovations on 2/12/01. DEP issued a NOCA on 3/2/01. On 3/30/01, DEP contactec engineer by telephone to discuss aspects of the SPPP design. DEP conducted a site inspection < 4/11/01 to evaluate existing streambank conditions. Two Extension of Review and Approval letters were issued on 4/13 and 4/30/01. DEP issued a letter to the engineer on 5/25/01 requesi additional information on maintenance of the proposed sand filter system and outlet protection details. The letter outlined a standard inspection procedure for the sand filter and recommendei removal of miscellaneous debris from the streambank. On 7/2/01, DEP received a revised SPI incorporating the requested additional information. On 8/2/01, DEP issued a SPPP Determination approving the revised SPPP. Conditions of the approval included removal of junk/debris from work areas on the streambank, sizing and design requirements for the rip-raf outlet protection, stockpiling restrictions, and filter bed inspection requirements. SEQRA - Unlisted Action - DEP performed an uncoordinated review and prepared a Neg Dec determination on 8/2/01.

Town: Middletown Drainage Basin: Pepacton Reservoir Project Name: Middletown, Salt Storage Facility, (Log #8402) Project Description: Proposed improvements to storage of sand, salt, and other road de-icing materials; MOA Program 126. Status: DEP conducted a site inspection with Delaware County Department of Public Works on 2/10/99, and reviewed the 12/98 site plans for this proposed salt storage facility. A letter was

35 NYC-WTC_000291061

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291061Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 88

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.922 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →