NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

issued on 2/22/99 addressing erosion and sediment control issues associated with the proposed slope cutting and gravel removal, and regrading for the proposed facility. In addition, drainage issues associated with elimination of the proposed wetland were also discussed. SEQRA - To be completed by others. No approval Regulatory permit required from DEP. DEP was contacted by the engineer on 6/14/99 concerning the proposed site on County Route 38 (located approximately one-quarter mile from NYS Route 30). This site has been rejected by Town of Middletown Town Board, and a new site in Arkville is under consideration. DEP was contacted by Delaware County DPW on 7/29/99 concerning a proposal to purchase a site adjoining the proposed Town of Middletown Highway Garage property (existing gravel mine) for use as a sand/salt storage facility. DEP provided general information on SPPP requirements. However, a complete site inspection must be scheduled to determine if a SPPP will be needed for this site. Review ongoing. DEP conducted a site inspection and on site meeting with Delaware County Departrnent of Public Works on 9/30/99 for this proposed salt storage facility to be located adjacent the new Town of Middletown Highway Garage (the County Route 38 site previously inspected and reviewed by DEP in 1998 has been rejected by the Town as a salt storage site). The site inspection revealed areas of steep slope, which would result in extensive cutting and filling during development. Review is in progress. A revised site plan for new sand and salt storage facility was submitted to DEP on 10/13/99. These plans are currently under review. DEP issued a letter to the Delaware County Department of Public Works on 11/12/99 addressing SPPP requirements for this project, which will need to be integrated into the SPPP for the new Town of Middletown Highway Garage facility. This requirement will be triggered if the total combined impervious surface area of both sites exceeds 40,000 square feet. DEP received a copy of the letter from CWC to engineer dated 3/6/00 stating the land purchase for the salt storage facility was finalized and preparation of the combined SPPP for the salt storage facility and highway garage could begin. DEP met with engineer and the CEO for the Town of Middletown at the Highway Garage Building site on 4/4/00 to discuss preparation of the SPPP for the Highway Garage and Sand and Salt Storage facilities. Plans for the existing highway garage building on NYS Route 28 were also discussed. 5/31/00; Erosion control measures in place. Building construction approximately 40% complete. 6/30/00: Erosion control measures in place. Building construction 100% complete. SEQRA - To be determined by others - No DEP approval required. 7/27/00 and 9/30/00; Erosion control measures in place. Building construction 100% complete. Awaiting submittal of stormwater plan in conjunction with adjacent highway garage. DEP forwarded aerial photographs and information to estimate pre­ development cover types to Rettew Engineering on 7/11/00. DEP received the SPPP for the Sand and Salt Storage and Highway Garage facilities on 9/21/00.On 10/11/00, DEP issued an SPPP NICA to the Town of Middletown. The NOICA requested additional information on drainage from outside of the development area, temporary erosion and sediment control measures, and revisions to the stormwater calculations. 11/15/00; Building construction 100% complete. DEP issued letter to CWC on 11/16/00 that the building construction is complete, however the site work still requires SPPP approval. Awaiting submittal of stormwater plan in conjunction with adjacent highway garage. On 12/12/00, DEP received revised plans and narrative for the SPPP. DEP issued a NOCA to Town of Middletown Supervisor on 12/22/00. DEP will notify the Town on or before 2/5/01 of its SPPP approval determination. On 2/1/01, DEP personnel conducted a site inspection of a wet area on DEP land adjacent to the project sii and issued a letter to the Town of Middletown requesting an extension of review and approval time until 2/22/01. The extension was requested to allow the engineer time to provide addition information and clarification on inconsistencies in the runoff and pollutant loading calculation; On 2/14/01, DEP staff met with the engineer to discuss these issues. On 2/21/01, DEP issued : second request for extension of review and approval time which extended the comment deadlii

36 NYC-WTC_000291 062

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291062Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →