DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

to 3/12/01 or ten days after receipt of the revised calculations. DEP staff witnessed soil test excavations for the proposed infiltration basin on 2/26/01. The soils appeared to be suitable infiltration practices. On 2/28/01, DEP received the revised SPPP from the engineer. On 3/14/01, DEP issued a SPPP Determination approving the SPPP for this project. Condition; approval included fuel spill control measures, snow disposal restrictions, and measures to prevent sediment from entering the basin during construction. On 5/30/01, DEP received a telephone call from the engineer stating that the Town intended to change the proposed land on a portion of the highway garage and sand/salt storage facility site. The Town wants to sti sand and gravel in an area shown as grass/lawn on the approved plans. The proposed chang use will increase the runoff volume and sediment load that will be directed to the pond folio development. In addition, a culvert will be installed from the south side of the salt storage s to the pond. DEP conducted a site inspection and on-site meeting with the engineer and To\ of Middletown personnel on 6/11/01 to discuss the proposed changes and pond design modifications that will be needed to treat the anticipated increase in runoff Due to the potei for increased sediment loading to the infiltration basin, DEP recommended that a sediment ti be installed in the low area/swale between the proposed sand and gravel storage area and the basin. DEP also noted that the culvert outlet to the pond may become blocked by sediment accumulations if maintenance is not performed regularly. Additional comments and recommendations will be provided when revised calculations and pond designs are received from the engineer. On 6/21/01, DEP received revised plans and calculations for the propose( changes. On 7/16/01, DEP issued a Modification of Approval that specified additional conditions for approval of the revised project proposal. The new conditions included a requirement for a silt trap above the stone filter area, rip-rap armoring of portions of the bash side slopes, and supplemental inspection requirements. SEQRA - Unlisted - DEP performec uncoordinated review and Neg Dec.

Town: Middletown Drainage Basin: Pepacton Reservoir Project Name: Hamilton Restaurant, Proposed Cafe, (Log #11073) Project Description: Proposed Sewer Connection to the NYC Sewer System Status: An application to convert an existing residence in the Village of Margaretville to a cafe was received on 12/29/99. A NICA was issued 1/4/00. Received letter from applicant regarding a under-the counter grease trap on 5/4/00. Issued review comments 5/22/00. DEP staff met wi the applicant on 6/27/00 to discuss review comments. Third NICA issued 3/1/01. The revise plans and an engineer’s response were received on 4/20/01. Upon review of the plans, DEP issued the Approved Determination on 4/24/01. The installation of a grease trap was comple on 6/6/01. The engineer submitted the certification of construction completion. However, th owner refused to authorize an “As Built” drawing to the engineer to be submitted. DEP sent j letter requesting an “As Built” drawing and if there is no response within 10 calendar days, th matter will be forwarded to the Legal Department. On 7/13/01 DEP received “As Built” drawing, and DEP sent a letter of the Construction Acceptance on 7/17/01. SEQRA - DEP Le; Agency; Type 11 - replacement in kind.

Town: Middletown Drainage Basin: Pepacton Reservoir Project Name: Hanah Country Inn, (Log #1017) Project Description: Demolition and reconstruction of 15,700 SF club house, 3,900 SF pool building, and 30 room inn on 27.6 acres with individual WWTS. Status: SEQRA Type I, Town is Lead Agent; application requires SSTS and SPPP approvals. DEP m(

37 NYC-WTC_000291063

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291063Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →