NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

with applicant on 10/13/98 for Pre-Application conference; WWTS will be constructed on the site of the existing building to be demolished. DEP witnessed deep hole and percolation tests on 11/2/98; watercourse determinations on 11/19 and 11/30/98; additional site investigation and watercourse evaluation on 12/22/98; received positive declaration and notice of scoping session from the consultant on 12/28/98. DEP issued a letter on 1/20/99 to the Code Enforcement Officer, Town of Middletown, copied to the engineer, addressing the applicability of the WR&R to various aspects of this proposal (subsurface sewage disposal, stormwater management, fuel storage, wetlands and watercourses which included DEP SEQRA concerns). DEP attended the Scoping Session for this project, held in Arkville on 1/21/99. Reviewed Final Scope on 2/17/99. DEP conducted a site inspection on 3/17/99 to identify and flag the locations of watercourses on the project site, and to discuss the applicability of the WR&R to various aspects of this proposal (subsurface sewage disposal, stormwater management, fuel storage and watercourses). Demolition of existing structures on property is taking place during April 1999. DEP conducted a site inspection and on-site meeting with engineer on 11/3/99 to discuss the SPPP currently under development for this proposed new clubhouse, spa building, and 30 unit guest lodge to be constructed on a 27.5-acre upland site. In addition, the location of the proposed golf cart path was inspected. DEP attended the Public Hearing for this project at the Margaretville Fire Hall on 11/10/99. Prior to the start of the hearing, engineer confirmed that the SPPP submitted to DEP on 10/27/99 is preliminary and should not “start the clock” on the review process. DEP requested additional plans and details on the proposed stormwater BMPs, which will be forwarded at a later date. Review in progress. SSTS application and the SPPP and Civil Plans were received on 2/25/00. Review is in process. DEIS received. DEP conducted a reinspection of the site on 3/9/00. A NICA for the SPPP and the Intermediate Septic was issued on 3/16/00. Additional information was requested on stormwater management issues, including justification for the extensive proposed piping of watercourses through the development. Additional information on erosion and sediment control and stormwater management practices was also requested. On 3/21/00, DEP issued a letter to the US Army Corps of Engineers (ACOE) stating that DEP did not flag wetlands on this site, and did not witness or verify the wetland flagging performed by North Country Ecological Services. This letter was issued in reply to a letter fron A.I. MacKay to ACOE dated 3/6/00 which suggested that DEP agreed to the locations and boundaries of wetlands on this site. On 4/14/00, DEP met on site with representatives from the engineering firm, Hanah Country Iim, DEC and US ACOE to discuss regulatory issues associated with the proposed wetland disturbance. USACOE advised the project representative that an individual permit will be required. DEP also advised the applicant of deficiencies in the stormwater management plan. DEP attended the Town of Middletown Planning Board meeting on 4/13/00. Following discussion of this issue, representatives from Hanah requested that DEP and engineer set up a meeting to discuss stormwater and wastewater issues. Scheduled meeting with the Applicant for 7/5/00. Issued correspondence approving the location of monitoring wells 7/13/00. Placement of wells completed 7/28/00. On 7/5/00, DEP met with the applicant, his attorney, and representatives from the engineering firm and Kajima Incorporated at the Hanah Country Inn site to discuss technical issues pertaining to the NICAs issued on 3/16/00. DEP staff met on 7/12/00 to discuss the issues raised at the meeting. A follow-up meeting witl the applicant and project team was held in Shokan on 7/27/00. The meeting was held to discus alternatives to the proposed stormwater plan layout and design. On 8/2/00, DEP met on-site with Hanah Country Inn representatives to inspect the upper portion of the site and to discuss relocating buildings and parking areas outside of wetlands and watercourses. The site inspect? revealed a large nearly level area at the top of the slope. No watercourses or significant wetlands were observed in this area during this cursory site inspection. However, a watercoun identified during a previous site inspection in the vicinity of well site #2 was found to originati

38 NYC-WTC_000291064

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291064Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →