NYC 9/11 Public Portal Document
Springfield Garden., Industrial Park (Air Froight Aroa) (a/k/a SE-727); Queens
Springfield Gardens Residential Areas (a/k/a SE-727A and SE-727B); Queens
The regular bi-monthly progress meeting was held on Thursday, August 3, 2000 and was attended
by representatives from the NYC Economic Development Corporation (EDC), their consultant
engineer, the NYC Department of Transportation (DOT), and the NYC Department of Design and
Construction (DDC). At this meeting, participants carefully reviewed detailed updates on the Phase
I work; however, the primary focus was the scope of the expanded Phase II work and the next two
segments of the joint DOT/DEP project. Also, it was clarified that the work involved in obtaining
a NYS Department of Environmental Conservation (DEC) wetlands construction permit was covered
under the Phase I scope of the EDC/Goodkind & O'Dea agreement. As a result of the DEC permit
involvement, it was further agreed that a representative from DEP's Office of Environmental
Planning and Assessment (OEPA) would be invited to future progress meetings.
Updates
General Water Quality and Quantity
is
As of August 18, the reservoirs were at 96.6% of capacity. Normal capacity for this time of year
85.1%. Consumption for August 17 was 1314.2 million gallons. The quality of Catskill/Delaware
and Croton source water continues to be excellent. Due to heavy rains several weeks ago, turbidity
to
levels in the Rondout Reservoir remain elevated. DEP has taken a number of operational steps
minimize turbidity levels leaving the reservoir. Most recently, BWS began drawing water off the
top of the reservoir as turbidity finally begins to settle to lower depths. Turbidity levels in
downstream reservoirs have become somewhat elevated, but there has been no threat to the quality
days,
of effluent at the Kensico Reservoir. Barring further significant rain events over the coming
Rondout quality should return to normal in the next few weeks.
Call by Recreational Fishers for Release of Water from Delware System
City
As part of a multi-state agreement between Pennsylvania, New Jersey and Delaware, New York
currently
is required to maintain a constant flow from our reservoirs to the Delaware River. We are
river
exceeding the agreed levels because of the very wet weather conditions and the needs of the
received
for additional releases further downstream in Pennsylvania are minimal. We have recently
usual flows
a request from recreational fishers just below our system who are seeing lower than
immediately downstream of the reservoirs to increase the flow from our reservoirs because of the
that we
comfortable water levels. In the interest of continuing our good neigbor policy, we expect
system.
will accomodate them over the next couple of months without any impact on our
Surcharge
install a water
After an initial surge of calls regarding the issuance of the surcharge for failure to
although we have
meter in residential properties, the volume of calls has dropped to normal levels,
that are now being received
seen an increase in letters and e-mails regarding this issue. The calls
include many whose water/sewer bills are paid through their mortgage company.
-4-
NYC-WTC 000137904
OCR can misread numbers and units. Confirm readings against the page image before using them.