DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

on the moderate slopes to the southeast of the “plateau” area. A follow-up letter was issued Hanah Country Inn on 8/18/00 addressing possible advantages of relocating the proposed buildings and parking lots to this upland site. The letter included a copy of the 8/7/00 letter Baker (Attorney for Hanah Country Inn) issued by the City of New York Law Department stating that DEP’s suggestions should not be interpreted as legal requirements. DEP condu< a site inspection of the upper portion of the lot and met with a representative of the engineer firm on 9/14/00 to evaluate watercourses above the existing wells. Engineers faxed DEP a i showing approximate locations of wetlands and channels on 9/19/00. DEP received a letter from engineer on 9/22/00 addressing North Country’s wetland delineation and preliminary i for relocation of the buildings and parking areas to the upper area. On 9/27/00, DEP conduc a second site inspection and delineated watercourses in the proposed relocation area. On 10/16/00, DEP issued a letter to Design Engineer summarizing the watercourse determinatic and flagging conducted on 9/22/00 and 9/27/00. DEP issued a letter to owner on 10/26/00 ii response to a request by engineer as to whether the SPPP review could be performed in an expedited time frame. The letter stated that the review process would begin as soon as the applications are complete. The letter also recommended that the project time line be evaluat with the engineers, and that the engineers discuss the plans with DEP prior to submission to avoid unnecessary delays. Correspondence issued 12/7/00 clarifying position for pilot testin: the SSTS and that DEP is in receipt of most recent submittal by Lamont Engineering and Al Geo-science. On 12/19/00, DEP received a FAX copy of a letter dated 12/16/00 from Hanai Country Inn requesting written clarification of DEP’s position on piping of the watercourse ( the Coon’s site. The letter states that the owners are considering moving the proposed development to the upper portion of the site, but a disagreement over payment of fees for the design revisions is holding up the project. On 1/4/01, DEP issued a letter to Hanah County I to address the issues raised in their 12/16/00 letter. DEP letter included an overview of the 1 foot setback requirements as specified in the WR&R and a summary of DEP’s involvement i the project (site inspection and plan review history). The letter also noted the potential probl with the original proposal to pipe the watercourse through the development area and advanta of relocating the project to the upper portion of the site. Correspondence issued 1/10/01 regarding the timing of ground water testing. On 2/13/01, DEP personnel met with representatives from Hanah Country Inn, Engineering Firm, Kajima Associates, North Couni Ecological, and Alpha Geoscience to discuss stormwater, wastewater, wetland and other issu associated with the planned relocation of the project further up the hill. During the meeting, engineer stated that Hanah has decided to proceed with the move, has notified the Town of Middletown of the change. Preliminary plans were presented for review and comment by DI persoimel. On 2/27/01, the engineer faxed minutes from the 2/13/01 meeting to DEP for revi and comment. DEP met with engineers following the Town of Middletown Planning Board Meeting on 5/10/01. A Conceptual General Plan has been developed for the relocated facility which is now proposed to be constructed on the upper portion of the site. The engineer provi DEP with a copy of this plan on 5/10/01. On 5/15/01, DEP received a copy of the Supplemei Environmental Assessment Report for the building site relocation. Also included was a revis Full EAF dated 5/10/01 and a memorandum from the engineers to the Town of Middletown Planning Board regarding the SEQRA process (included supporting documentation). On 6/6/ DEP received a faxed copy of the preliminary Layout and Grading Plans from Lamont Engineers. The plans show approximate locations of stormwater ponds, buildings and impervious surfaces. On 6/19/01, DEP received a copy of a letter from the engineers to ACO dated 6/15/01 requesting Jurisdictional Determination of the wetland flagging shown on the Concept General Plans (included with the letter). DEP personnel met with the engineers on 6/20/01 to discuss the preliminary plans and to provide recommendations for preparing the

39 NYC-WTC_000291065

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291065Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →