DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

absorption field and a grease trap requirement. On 12/2/99 DEP received the plans and Engineer’s letter requesting the approval of the modification of the dosing system, from siphon to a dual pump dosing system. DEP requested hydraulic calculations and a few revisions of the Site Plan. On 12/20/99 DEP issued the letter of Design Approval for the dosing system modifications. On 3/23/00 DEP called the consulting engineer for the construction progress status. The engineer will contact the contractor. On 5/18/00, the engineer performed the pumps and siphons operational tests and the percolation tests on the fill material. The percolation rates of 4 out of 10 absorption field were rates of 120 to 140 min/in. All pumps, alarm system and the siphon tests were acceptable. On 5/31/00, the engineer repeated the percolation tests on the four fields which were not satisfactory. Again the percolation rate were over 120 minutes. The remedial action are not proposed at this time. The low pressure sewer lines were tested and found there was no leakage. Consulting Engineer submitted the draft proposal of the remedial action for the absorption field that the percolation rates on fill were not within acceptable range. The proposal is to monitor actual flow range to investigate whether the six (6) fields are adequate or not, and installation of monitoring wells in the four fields that were not acceptable based on the percolation tests. On 7/17/00, DEP received an Engineer’s Report dated 7/10/00 regarding the testing of the pumping station, dosing operation, sewer line, and percolation of the fill material. The four absorption fields out of ten were not acceptable for percolation rates. The Engineer proposed to conduct sewage flow monitoring and actual seepage monitoring through observation wells. DEP accepted the proposal with certain conditions. DOH also accepted the proposal with corrective measure requirement. The engineer advised DEP that the dosing counter and monitoring well has been installed and will take flow data recording. On 10/23/00 DEP contacted the engineer regarding the latest status of the monitoring report. The engineer in charge was not available. The consulting engineer called to request a meeting regarding absorption fields #1,^,9 and 10 on 2/2/01. On 2/2/01, the consulting engineer and DEP met with the representative of the Buddhist Center to solve outstanding absorption field (#7,8,9, and 10) problems. DEP is awaiting an engineer’s letter regarding the subject discussed at the meeting. The letter will include the system maintenance requirements and monitoring and requested the construction acceptance for the absorption fields #1 through #6, which DEP verbally accepted at the meeting. On 3/5/01 DEP received a letter fi-om the Engineer follow-up to our meeting on 2/2/01. The letter was addressed requesting the construction acceptance of the SSTS with the 6 absorption fields (1, 2, 3, 4, 5, and 6). The fields 7, 8, 9, and 10 will be further investigated. Maintenance requirement was also addressed. DEP issued the letter of Construction Acceptance for fields #1 through #6 on 3/13/01. DEP called the engineer for follow-up on the absorption system corrective work and monitoring sewage flow and monitoring well inspection. On 6/22/01, DEP received a letter from the center’s representative dated 5/21/01, requesting a copy of all previous correspondence. DEP received confirmation fi-om the Center, of continuous monitoring and installation of the septic tank, effluent filter, and surface repair of field No. 10. DEP and the engineer visited the site on 7/25/01 and met with the representative of the Center t discuss the extent of the work needed. SEQRA - Type II - Less than 4,000 sf.

NEW PROJECT #20 Town: Walton Drainage Basin: Cannonsville Reservoir Project Name: James Richardson Property, (Log #11799) Project Description: Proposal to clear small stream to prevent flooding of driveway - 100-200’ long x 2-6' wide x 6- wide. Status; DEP has reviewed the materials received on 6/25/01, conducted a site evaluation on 7/2/01, am issued a comment letter dated 7/3/01 to DEC.

46 NYC-WTC_000291072

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291072Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →