NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 54 pages

DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Town: Walton Drainage Basin: Cannonsville Reservoir Project Naine: Walton High School Running Track, (Log #11656) Project Description: The application is for the resurfacing of O’Neill High School’s running track. The project w: result in 43,077 of new impervious surface. A infiltration trench is proposed for the stormwater facility. Status: On 3/26/01, DEP received the Stormwater Management Plan from the engineer dated 3/23/0 DEP issued a NICA on 4/19/01. The revised plans and specifications were received on 7/9/( DEP issued a NOCA on 7/17/01. One additional minor comment was addressed and the plar are now approvable. An approval was issued 8/2/01. The track SPPP provides infiltration facilities including catch basins with adequate sumps for pre-treatment of solids and protecte outfall structures. In response to a letter from the Catskill Watershed Corporation (CWC) th Permittee sent a letter to DEP requesting support for funding. The CWC questioned the necessity of the 36 inch culvert capacity for conveyance and the bedded material used to sloi the percolation rate in the surrounding soils. DEP sent a letter to the engineer on 8/28/01 sta the requirements of an SPPP including standard references for plan preparation. SEQRA -1 11 - Replacement in kind.

Town: Walton Drainage Basin: Cannonsville Reservoir Project Name: DOT Route 10 over West Branch; PIN 9095.76, (Log #5989) Project Description: Repair of existing bridge along Route 10 over West Branch Delaware River. Status: SEQRA Type II- Repair if existing structure. DEP reviewed advanced detail plans date 1/98 through 7/98; conducted site visit on 9/17/98; issued comment letter to DOT on 9/21/98. DE conducted an inspection of the proposed staging and access areas for this bridge reconstructic project on 6/16/99, and provided comments to OWSL on 6/24/99. DEP attended an on-site meeting with DOT on 7/28/99. Issues discussed included erosion and sediment control measures at the proposed staging and access areas, waste material storage and disposal, watei quality protection measures to be implemented during the bridge repair, and submission to D of Class A containment drawings. A review of the submitted materials is ongoing. DEP isst a letter to DOT on 9/13/99 addressing containment issues, temporary erosion and sediment control measures, water quality control, and hazardous material/waste handling issues. Additional comments will be issued upon review of the notes on bridge washing, supplement containment specifications, and asbestos control procedures. Review in progress. DEP received the containment drawings and water washing plans for the bridge from DOT on 9/20/99. DEP issued a response letter to DOT on 10/13/99 stating that all DEP concerns havi been addressed regarding wash water handling and disposal issues. DEP contacted DOT on 5/22/00 for an update on the status of the project. DOT forwarded a letter fi-om general contractor dated 9/24/99 which addressed comments raised in DEP’s 9/13/99 letter, which addressed some of DEP issues. DEP will request additional information. Construction inspection on 6/27/00. Contractor is mobilizing. Signals are in place and functioning. Bridg limited to one lane of traffic. Silt fence is in place according to plan. Construction inspection 7/31/00. Bridge is limited to one lane of traffic. Concrete barrier is in place. Construction of suspended platform containment beneath bridge continues. Tarp installation is approximate!) 50% complete. Construction inspection on 8/31/00. Construction of suspended platform containment beneath bridge is complete. Asbestos removal has begun. Construction inspect! on 9/27/00. Asbestos and lead removal has been completed. Construction on bridge continues scheduled. Silt fence is in place according to plan. Construction inspection on 10/23/00. Brid is limited to one lane of traffic. Concrete barrier is in place. Construction of suspended platfo

47 NYC-WTC_000291073

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291073Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →