DEP progress report on wastewater plants, Oct 2001

Machine-extracted title · confidence 49%

Progress report on technical support plan implementation for NYC wastewater plants, Oct 2001.

NYC-WTC_000291027–000291080
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

containment beneath bridge is complete. Asbestos and lead removal has been completed. Construction on bridge continues as scheduled. Silt fence is in place according to plan. Construction inspection on 12/18/00. Concrete barrier is in place but will be removed 12/19/00 for the winter. Suspended platform containment beneath bridge is being left in place on west end. Construction on bridge will cease 12/19/00 until Spring 2001. Silt fence is in place according to plan. 5/30/01-Contractor is mobilizing to begin construction 6/4/01. Construction inspection on 6/27/01, 7/31/01, and 8/28/01 9/19/01. Bridge is limited to one lane of traffic. Concrete barrier is in place. Silt fence is in place according to plan. Contractor continues construction on the second half of the bridge. Contractor has begun construction on the second half of the bridge. Construction inspection on 9/19/01. Concrete barrier has been removed. Silt fence has been removed and area is stable. Contractor has removed temporary lighting. Temporary stripping being done. Micro-surfacing will be done next week. Bridge is open to rive lanes. SEQRA - Type II - Replacement in kind

Town: Wawarsing Drainage Basin: Rondout Reservoir Project Name: Trout Brook Bridge E&S Control Plan, (Log #3679) Project Description: Stormwater management review for demolition and replacement of Trout Brook Bridge over Trout Creek on NYS Route 55 A east of intersection with Yagerville Road (CR 46). Status: DEP reviewed the 1/13 and 1/21/97 correspondence and plans and specifications dated 12/10/96; conducted site investigation on 1/22/97. DEP sent letter and marked up plans to DEP Project Engineer on 2/4/97. DEP received final investigation report dated 1/97 on 3/21/97. DEP received revised specifications on 5/19/97 based on DEP comment letter dated 5/14/97. Construction inspection on 9/29/98; construction approx 10% complete. Construction inspection 1/29/99, - 25% complete. Construction inspection 2/26/99 - 28% complete. Construction inspection 4/26/99 - 40% complete. Construction inspection 5/28/99 - 50% complete. Construction inspection 6/30/99 - 60% complete. Construction inspection. 7/27/99 Status: Construction 65% complete. Construction inspection. 8/31/99 Status: Construction 70“ complete. Construction inspection. 9/30/99 Status: Construction 75% complete. Construction inspection. 10/31/99 Status: Construction 80% complete. Construction inspection. 11/30/99 Status: Construction 85% complete. Construction inspection. 12/30/99 Status: New bridge ope to traffic. Demolition of old bridge to begin January, 2000. Construction inspection. 1/31/00 and 2/28/00 Status: New bridge open to traffic. Demolition of old bridge underway. Construction inspection. 4/28/00: Demolition of old bridge underway. Construction inspectior 5/30/00: Demolition of old bridge 25% complete. Construction inspection. 5/30/00: Demoliti( of old bridge 50% complete. Construction inspection. 7/24/00: Demolition of old bridge 75% complete. 8/30/00: Demolition of old bridge 90% complete. 9/30/00: Demolition of old bridg( 95% complete. Site restoration underway. 10/30/00 and 11/30/00: Demolition of old bridge 95% complete. Site restoration underway. 12/26/00: Construction 95% complete. Site restoration will be completed in Spring 2001. 1/31/01: Construction 98% complete. Site restoration will be completed in Spring 2001. 2/22/01 & 3/28/01: Construction 99% complete. Site restoration will be completed by May 2001. 4/30/01, 5/24/01 & 6/18/01 : Construction 100% complete. Site restoration and landscaping underway. 7/25/01: Construction 100% complete. SEQRA - DEP lead Agency , Unlisted Action, Neg Dec on 2/12/98.

48

NYC-WTC_000291074

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291074Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 74

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.920 (not a probability)

machine-extracted · confidence unavailable · Check page ↗
Permit application, Education Dept. · page 73

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.918 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →