NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document r

Depart MEN t of T r a n s p or t a t i o n • The contract for the reconstruction of the Williamsburg Bridge subway was extended to include platform installation, bearing replacement, and completion of additional NYCT work, such as replacement of plates along the subway tracks over Ridge Street; work was completed in July 2001,

• The scope of work for the north roadways of the Williamsburg Bridge is a mirror image of the completed Williamsburg Bridge south roadways, which includes the complete replacement of the main bridge deck with a steel orthotropic deck system and new concrete approach structures. The north roadways were closed to traffic on January 29, 2001 to perform necessary work. Work on the north outer roadway was completed on December 10, 2001, a total of 50 days ahead of schedule. Work on the north inner roadway is scheduled tor completion on July 29,2002.

• The rehabilitation of the lower outer roadways on the Queensboro Bridge continued during Fiscal 2002. Rehabilitation of the City Shops on the Manhattan side of the bridge and work on travelers, which are movable underdeck platforms, was fully completed in October 2001. The final work item, rehabilitation of the necklace lighting, was completed in December 2001.

• In Fiscal 2002 the Department continues to use Design-Build contracts to expedite capital bridge rehabilitation. The contracts retain the same company for both design and construction on selected projects. Generally, a bridge project with different companies executing the design and construction requires six to eight years to complete.

In July 2001 the Department issued an RFP for the Design-Build contract to replace the Belt Parkway Bridge over Ocean Parkway in Brooklyn. The scope of work entails replacement of the existing bridge with a wider and longer bridge that will improve traffic flow and help to prevent accidents. The project will include incentive/disincentive and liquidated damages clauses to ensure timely completion of critical activities and minimize inconvenience to the public. Three of the six traffic lanes will be maintained in each direction during all stages of construction. The Department expects to issue a Notice to Proceed in early Summer 2002. The project is scheduled for completion in October 2004.

• In December 2000 DOT in-house carpenters completed replacement of the Brooklyn Bridge pedestrian walkway deck and its support beams. In-house ironworkers are currently replacing the deteriorated sections of promenade railing with replicas of the existing steel. This project will continue through Summer 2002. Virtually all of the work is done from the promenade, closing the left roadway lane as little as possible.

I • The refurbishment of the Manhattan Bridge’s landmark arch and colonnade was substantially completed in June 2001. Work includes reconstruction of the roof; waterproofing; installation of drainage systems and architectural illumination for the arch and colonnade; and the rehabilitation, cleaning, and graffiti protection of the masonry. For the bridge plaza, roadways and traffic islands were realigned, granite block paving was installed, lighting was improved and trees were planted. The remainder of the work, which includes replacing the debris net, painting conduits, and completing electrical punch list work, was substantially completed in mid-October 2001.

• In September 2000 the Department received bids for the contract to rehabilitate the entire north side of the Manhattan Bridge. The Notice of Award was issued to the lowest bidder in December 2000. The scope of work includes replacement of subway track and framing, painting, construction of a new bikeway, installation of a new traffic surveillance system, and installation of a state-of-the-art structural system to reduce bending of the bridge. The work is scheduled for completion by September 2004. The north lane of the lower roadway was closed to traffic in June 2001 for use as a construction staging area. At the same time, the south lane of the lower roadway was reopened to traffic. Subway service was restored to the south tracks on July 22, 2001. On that same day, service was temporarily discontinued on the north tracks until January 31,2004.

75 ■J

CITY_21MC100_013395149

NYC-WTC_000245536

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245536Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →