NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document r

D e p artm e nt O F Tran s po rtatio n DOT changed the timing of traffic signals at a number of locations to better facilitate movement under heavy traffic conditions. On Church Street between the Brooklyn-Battery Tunnel exit and Canal Street in Manhattan, the signal timing was changed from a “progressive” to a “simultaneous” pattern during specific time periods. In addition, DOT implemented pedestrian crossing signal phases at four Midtown Manhattan locations to ensure time for pedestrians to safely cross intersections.

The Department revised traffic and parking regulations in selected areas of Midtown Manhattan to facilitate traffic flow and protect the safety of pedestrians and motorists. Right turns were prohibited during the day on Fifth Avenue between 47’*’ and 55*" streets to ease congestion around Rockefeller Center. Parking regulations on several cross-streets were revised to prohibit standing during peak periods, providing additional parking on selected westbound streets as well as westbound access.

TMC, located in Long Island City, Queens, receives images from 135 traffic-monitoring cameras and disseminates information to the public traveling to the City through 39 fixed or portable variable message signs located along major thoroughfares and bridge and tunnel crossings. Variable message signs advise motorists of traffic conditions. By maintaining lines of communication with other City, State and federal agencies, DOT can obtain and disseminate information through 60 additional variable message signs when necessary.

In the first four months of Fiscal 2002 DOT continued to participate in a Permit Coordination initiative with NYPD; the Fire Department of the City of New York; the Mayor’s Community Assistance Unit Street Activity Permit Office; the departments of Environmental Protection, Parks and Recreation (DPR), Information Technology and Telecommunications, and Design and Construction; and the Mayor’s Office of Film, Theatre and Broadcasting. Led by the Mayor’s Office of Operations, the initiative establishes a uniform citywide procedure for issuing all permits that affect traffic and street conditions. DOT adapted its Management Oriented Street Attribute Information Control System (MOSAICS) street permitting system to accommodate use by the other agencies. Each permit-issuing agency is now entering its data and accessing other agency data through MOSAICS to identify and resolve conflicts, improve traffic mobility and avoid unnecessary street closures. Additionally, the permit-issuing agencies have access to a state-of-the-art Geographic Information Systems permit-mapping system. The system displays updated information on street closures and areas reserved for special events, construction, emergency repairs and motion picture filming.

Bridge Maintenance and Rehabilitation In Fiscal 2001 DOT completed construction of an entrance ramp to the Belt Parkway from Cropsey Avenue in Brooklyn; landscaping and tree planting will be completed in Spring 2002. A total of 40 trees had been planted by the end of November 2001.

In the first four months of Fiscal 2002 DOT completed reconstruction work on the following bridge structures in Brooklyn: 4"^ Avenue over NYCT, Kings Highway over NYCT and Ocean Parkway over the Long Island Railroad. The Kings Highway Bridge, which utilized a prefabricated superstructure, was opened one week ahead of the accelerated schedule.

• The $136 million reconstruction of the landmark Macombs Dam Bridge over the Harlem River continues. In late March 2001 the contractor finished Stage I construction work, which consisted of installation of structural components, as well as deck replacement of the northern one-third of the bridge and the 155'’’ Street viaduct, as scheduled. The contractor began Stage 11 in November 2001, immediately after the conclusion of the Yankees baseball season. This stage entails installation of structural components and deck replacement of the middle one-third of the bridge, and was completed on February 20, 2002. Completion of the entire reconstruction is expected in Spring 2003.

I 74

I CITY_21MC100_013395148

NYC-WTC_000245535

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245535Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →