NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Department OF DEisign and Construction • During the second half of Fiscal 2000 DDC began a pilot evaluation of two Web-based project management tools that track projects through their life cycles, provide a repository for documents and drawings, and facilitate distribution of information and team communications. DDC has recently added a third Software product to the pilot program and began using it on a new infrastructure project. One of the original pilot projects is now complete. When the remaining two pilot projects are complete, DDC will analyze the results and make a determination about the effectiveness of the tools and future implementation.

• The Department continues to track and report Key Performance Indicators (KPI) for design and construction projects in its Structures and Infrastructure divisions as well as for DDC’s Chief Contracting Office, Information Technology Unit, Legal Department, the Survey Unit of the Technical Support Division and for the Personnel Unit. Initial results of KPI implementation include improved capital project planning, reduced duration of legal contract review, faster turnaround on surveys for design and a reduction in processing time for critical phases of the Agency Chief Contracting Office procurement process. KPI reporting is currently being developed for the agency’s Internal Audit unit.

Design and Process Reform

• In order to better manage its workload and increase productivity and effectiveness, DDC has committed a predetermined percentage of the capital commitment plan within the first half of each fiscal year by distributing the bidding of construction contracts more efficiently. Historically, the majority of capital commitments have occurred during the last quarter of the fiscal year. Each year DDC has exceeded its plan. During the first six months of Fiscal 2002, DDC committed 41 percent of the capital commitment plan, exceeding its plan of 32 percent.

• The Department continues to implement its High Performance Building Guidelines on select capital projects. The guidelines include objectives, technical strategies and performance criteria for the construction and operation of more energy-efficient buildings; goals range from improved indoor air quality to reduced operating costs. To date, DDC used the guidelines for two completed construction projects and is now using them for one project currently in construction and 16 projects currently in design. An additional six projects that are in the pre-design phase have been identified for future guideline implementation.

• During Fiscal 2001 DDC instituted a new design quality initiative called “Peer Review” or “Commissioner’s Review.” This is a presentation of a particular project by its architect to the Commissioner, senior staff and one outside architect. The goal is to ensure that design and urban issues have a chance to be presented and considered in the development of new buildings, and to share knowledge among the staff. An important part of the review is the participation of an outside architect, who is expert in the type of building that is being reviewed. Projects that come to the Commissioner’s review will generally be in the schematic phase or early design development, which allows the architect time to accommodate suggestions before the design is finalized.

The Peer Review also provides staff with State-approved continuing education credits towards professional licensing requirements.

From July 2001 to January 2002 four projects were reviewed: the Queens Criminal Court expansion, Aaron Davis Hall, PSAC 11 and the renovation of the Highbridge Library.

150

CITY_21MC100_013395222

NYC-WTC_000245609

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245609Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →