On Thursday, September 28th, DEP scheduled a presentation for our agency
representative from the City of
fiberoptic use of watermains and sewers. John Adams, a Council system
Toronto, explained how Toronto had made use of their abandoned high pressure watermain
Toronto would also share
• to carry fiberoptic conduit. Mr. Adams shared his REP and indicated that
with the winning bidder once
the Memorandum of Agreement which was subsequently developed
interesting and
assurances protecting confidentiality were received. Mr. Adams made reference to an
contracted for four out of five areas
very aggressive model in Chicago where he believes RCN has
premise within four years
• in the City which were bid out in which they are expected to link up every designed
• frberoptically. Link-Pipe of Toronto, a company which uses robotics to install a specially
watermains
fiberoptic cable to safely be placed in certain types of sewers and unused or abandoned environments.
utilized in different
without a protective duct demonstrated how its product could be
Comptroller's Audit
has raised an issue
The New York City Comptroller is currently auditing DPR'& concessionaires and
also has been attempting
of unpaid water and sewer bills for certain concessionaires. DEP concerns as
unsuccessfully to collect from the operator of the Douglaston crabhouse and had some
very productive
to whether it had a totally up to date list for all new tenants. DEP staff had a
revenue paying
meeting with DPR revenue staff to discuss how to improve collections from Parks'
strengthen
tenants. Parks committed to provide lists of new tenants, review existing contracts, and
together a flat rate charge for tenants
new contracts as needed. They also indicated they would put
provide Parks with regular
at Orchard Beach which is a seasonal facility. DEP agreed to
information on non paying tenants.
Route 120/22 Project
project in
DEP and NYSDOT have scheduled a meeting to discuss the status of the Route 120122
mitigation sites. DEP has taken
the Kensico Reservoir Watershed and to view the proposed wetland
them with created ones as
issue with the State's proposal to eliminate certain wetlands and replace
wetlands, totaling more than
part of the Route 120122 project. NYSDOT now proposes to create two
to the reservoir from, the
10 acres, to provide final treatment of stormwater that would be discharged
comments to NYSDOT
existing, and proposed, impervious surfaces. DEP has consistently provided
NYSDOT's agreement
that limit the scope of the project and the potential impact to the reservoir. likely to
-project stormwater runoff in the area means that water quality is
to treat existing, pro
actually improve with the project.